Y1DA--Replace Nurse Call System | 652-21-102
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
The Contractor shall provide the following services in accordance with this Scope of Work and all contract drawings, specifications, and amendments. The overall intent of this project includes, but is not limited to the following:
The contractor is responsible for all facets of work, which includes, but is not limited to demolition, architectural, structural, electrical, electronics/security, telecommunications, and healthcare technology systems, to facilitate a successful upgrade of the existing facility nurse call/code blue system and any associated infrastructure. The project shall include, but is not limited to, upgrading nurse call/code blue system hardware and software, user terminals, patient room devices, notification/signaling devices, and any interconnecting data infrastructure. The project shall be phased in such a way to minimize and, if possible, avoid nurse call/code blue system outages.