Y1NB--336C25726R0025 C549-23-600 Construct Garland Energy Center Design-Build Construction

SOL #: 36C25726R0025Pre-Solicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
257-NETWORK CONTRACT OFFICE 17 (36C257)
San Antonio, TX, 78240, United States

Place of Performance

Garland, TX

NAICS

Power and Communication Line and Related Structures Construction (237130)

PSC

Construction Of Heating And Cooling Plants (Y1NB)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)

Timeline

1
Posted
Feb 2, 2026
2
Last Updated
Apr 13, 2026
3
Response Deadline
Jul 15, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Veterans Affairs (VA), Network Contracting Office 17, intends to issue a Request for Proposals (RFP) for a Design-Build Construction project to construct a new Garland Energy Center at the Garland VA Medical Center, TX. This project aims to replace outdated infrastructure with a modern, stand-alone facility. This is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside. The RFP is anticipated to be issued on or about April 27, 2026. Responses to this presolicitation notice are due by July 15, 2026.

Scope of Work

The project involves the comprehensive design and construction of a new energy center. This includes:

  • Design Services: Architectural, structural, site/landscaping, mechanical (HVAC, steam, chilled water), electrical, plumbing, interior design, life safety, physical security, and communications systems.
  • Construction Services: All labor, materials, and services for the new energy center building and a connecting walkable utility tunnel.
  • Key Components: Housing essential heating, cooling, fuel oil, bulk oxygen, and electrical generation equipment. The utility tunnel will connect to the main hospital and an outlying building (900 Shiloh).

Contract & Timeline

  • Contract Type: Firm Fixed Price, Design-Build.
  • Magnitude of Construction: Estimated between $50,000,000 and $100,000,000.
  • NAICS Code: 237130 (Commercial and Institutional Building Construction) with a size standard of $45M.
  • Set-Aside: 100% Service-Disabled Veteran-Owned Small Business (SDVOSB).
  • Anticipated RFP Release: On or about April 27, 2026.
  • Presolicitation Response Date: July 15, 2026.
  • Estimated Durations: Design Phase: ~482 calendar days; Construction Phase: ~1060 calendar days.

Performance Standards & Special Requirements

Designs and construction must comply with all federal, state, and local codes, standards, and VA directives, with an emphasis on energy management, sustainability, and environmental protection. Strict adherence to safety protocols (ILSMs, LOTO) and robust QA/QC are critical. Eligibility: Apparent successful offerors must have a current VETS 4212 report, be registered in SAM, and be registered in the SBA MySBA Certification at the time of proposal submission. Personnel must meet specific experience and certification requirements (e.g., OSHA 30/10-hour, RCDD, LEED).

Additional Notes

A pre-bid site visit will be announced with the solicitation. Questions regarding this opportunity will not be answered prior to the release of the solicitation. Relevant attachments include a Central Utility Plant Study and utility as-builts. Revit files will be provided post-award. Contact: Horacio Fernandez, Contracting Officer, horacio.fernandez@va.gov.

People

Points of Contact

Horacio FernandezContracting OfficerPRIMARY

Files

Files

Download
Download

Versions

Version 2Viewing
Pre-Solicitation
Posted: Apr 13, 2026
Version 1
Pre-Solicitation
Posted: Feb 2, 2026
View