Y1NB--Project 546-22-110 - Construct a New Boiler Building and Controls in the Old Incinerator Area Expand/Move Graphic Control

SOL #: 36C24826R0090Solicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
248-NETWORK CONTRACT OFFICE 8 (36C248)
TAMPA, FL, 33637, United States

Place of Performance

FL

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Heating And Cooling Plants (Y1NB)

Set Aside

No set aside specified

Timeline

1
Posted
Mar 30, 2026
2
Last Updated
Mar 30, 2026
3
Submission Deadline
May 8, 2026, 3:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Veterans Affairs (VA), Network Contracting Office 8 (NCO 8), is soliciting proposals for Project 546-22-110: Construct a New Boiler Building and Controls in the Old Incinerator Area, and Expand/Move Graphic Control at the Bruce W. Carter VA Medical Center in Miami, FL. This is an Unrestricted solicitation, open to all qualified businesses. Proposals are due by Wednesday, May 08, 2026, at 11:00 am EST.

Scope of Work

This project involves the construction of a new two-story utility building (approximately 5,000 sq ft per story) and renovation of existing areas (approximately 1,665 sq ft). Key deliverables include the installation of three new 400-horsepower (HP) boilers, a new Boiler Control Room, and the furnishing and installation of two 400 HP rental, stand-alone, dual-fuel mobile temporary boilers to maintain hospital steam load during construction. The project also requires the demolition and disposal of existing boilers and ancillary equipment. The overall goal is to renovate and upgrade the existing steam generation and auxiliary systems to address HVAC deficiencies and meet N+1 redundancy standards. The work includes extensive architectural, structural, mechanical, electrical, and plumbing modifications, as detailed in the provided drawings and specifications, which have been updated by Addendum 2 (January 31, 2025).

Contract Details

This will be a Firm-Fixed-Price contract. The estimated magnitude of construction is between $20,000,000 and $50,000,000. The Period of Performance (POP) is 1095 Calendar Days from the Notice to Proceed (NTP). Award is contingent upon the appropriation of funds.

Set-Aside

This is an Unrestricted solicitation, open to all qualified businesses regardless of size or socioeconomic status. No set-aside requirements apply.

Submission & Evaluation

  • Proposals Due: Wednesday, May 08, 2026, at 11:00 am EST.
  • Site Visit: Monday, April 13, 2026, at 09:00 am EST.
  • Requests for Information (RFI) Due: Monday, April 20, 2026, at 11:00 am EST.
  • Proposals must be submitted via email to Aldwyn.Singleton@va.gov and Jean.Pierre1@va.gov.
  • Evaluation factors include Technical Approach (Specialized Experience, Technical/Management Approach, Project Planning/Scheduling, Energy Efficiency/Environmental Impact), Past Performance, and Price. Technical Factors and Past Performance combined are significantly more important than Price.
  • Mandatory submissions include the EMR form (Experience Modification Rate greater than 1.0 will disqualify), Specialized Experience Form, Past Performance Forms, and a detailed Base Offer Price Breakdown using the provided template. Offerors must also complete and return the VAAR 852.219-75 certification regarding subcontracting limitations.
  • Offerors must be registered in the System for Award Management (SAM). A Bid Guarantee of 20% of the proposal price or $3,000,000 (whichever is less) is required, and Payment and Performance Bonds will be required upon award.

Key Considerations

The project involves working with contaminated soil (arsenic), requiring strict adherence to the Site-Specific Health and Safety Plan (HASP) and Soil Management and Dust Control Plan. Compliance with VHA Pre-Construction Risk Assessment (PCRA) and Infection Control Risk Assessment (ICRA) protocols is mandatory. Addendum 2, dated January 31, 2025, introduced significant revisions to specifications and drawings, particularly concerning the temporary boiler plant relocation and integration, which bidders must review carefully.

People

Points of Contact

Jean PierreContracting OfficerPRIMARY
Aldwyn SingletonSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 2Viewing
Solicitation
Posted: Mar 30, 2026
Version 1
Pre-Solicitation
Posted: Mar 30, 2026
View
Y1NB--Project 546-22-110 - Construct a New Boiler Building and Controls in the Old Incinerator Area Expand/Move Graphic Control | GovScope