Y1NZ--Design-Build (DB) Connect Reclaim Water at Lake Baldwin Campus
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of Veterans Affairs (VA), Network Contract Office 8, is soliciting proposals for a Design-Build (DB) project to connect reclaimed water at the Lake Baldwin Campus in Orlando, FL. This Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside opportunity involves connecting the campus irrigation system to the City of Orlando's reclaimed water main and paving an existing gravel parking lot. Phase One proposals are due March 23, 2026, at 11:00 AM EST.
Project Overview
This Two-Phase Design-Build project requires a qualified firm to:
- Reclaimed Water Connection: Design and construct a connection to the City of Orlando's reclaimed water main to supply the Lake Baldwin VA Campus irrigation system. This includes installing new piping, fittings, valves, pumps, flow sensors, electrical wiring, and controllers, adhering to City of Orlando Engineering Standards. A Ground Penetrating Radar (GPR) survey is required.
- Parking Lot Paving: Pave the existing gravel parking lot southwest of Building 500 with asphalt, stripe parking spaces, and add a new entry point on the north side. The design must accommodate various vehicle sizes and comply with City of Orlando Code of Ordinances, including drainage calculations and a new Environmental Resource Permit (ERP).
Contract Details
- Contract Type: Firm-Fixed-Price
- Magnitude of Construction: Between $500,000 and $1,000,000
- Period of Performance: 661 calendar days total (347 calendar days for design phase, 314 calendar days for construction phase)
- NAICS Code: 237110 (Water and Sewer Line and Related Structures Construction)
- Product Service Code (PSC): Y1NZ (Construction Of Other Utilities)
- Place of Performance: Department of Veterans Affairs, Orlando VA Healthcare System, 5201 Raymond Street, Orlando, FL 32803
Submission & Evaluation
This is a Two-Phase Design-Build solicitation.
- Phase One Proposals Due: March 23, 2026, at 11:00 AM EST.
- Submission Method: Proposals must be submitted via email to michael.zorzi@va.gov and aldwyn.singleton@va.gov, in PDF format, not exceeding 7MB.
- Phase One Evaluation: Proposals will be evaluated based on technical approach, technical qualifications, and past performance. A maximum of five offerors will be selected to proceed to Phase Two.
- Phase Two: Selected offerors will submit detailed technical and price proposals.
Key Requirements & Attachments
Bidders must address several mandatory requirements and submit specific forms:
- Past Performance: Submit Attachment E (Past Performance Questionnaire) to previous clients for direct submission to the VA Contract Specialist by the offer due date.
- Specialized Experience: Complete Attachment D (Specialized Experience Form) detailing relevant past contracts.
- Safety & Insurance: Complete Attachment C (EMR Form), providing OSHA 300 data and Experience Modification Rate (EMR). An EMR greater than 1.0 will result in disqualification.
- Subcontracting Limitations: Submit Attachment F (Limitation of Subcontracting Certificate), certifying compliance with limitations (e.g., not paying more than 85% of contract amount to non-SDVOSBs for general construction).
- Wage Determination: Adhere to Attachment B (Wage Determination) for Orange County, Florida, for labor costs.
- Price Breakdown: Utilize Attachment G (Base Offer Price Breakdown) for a detailed cost proposal.
- Licensing: The Design-Build team must be licensed in Florida, with design documents signed and sealed by a licensed Florida Professional Engineer and/or Architect.
- Safety: Comply with OSHA safety requirements, including 10-hour construction worker course for all personnel and 30-hour course for general superintendent/supervisor.
Important Notes
- Amendment 0001 (S06 36C24826R0057 0001.pdf) provides answers to Requests for Information (RFIs) and includes the "Lake Baldwin Site Plan Utilities Model." Offerors must acknowledge receipt of this amendment.
- Funds are not presently available; award is subject to availability.
- The offer acceptance period is 120 calendar days.
- Points of Contact: Michael C Zorzi (Contract Specialist, Michael.Zorzi@va.gov) and Aldwyn Singleton (Contracting Officer).