Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
Amendment 0003 has been issued for the Y810 Maintenance Building Construction solicitation by the Department of the Army, W074 ENDIST CHARLESTON. This amendment primarily extends the proposal due date and clarifies several technical specifications and scope items related to miscellaneous building construction (Product Service Code Y1JZ).
Scope of Change
This amendment introduces the following key changes:
- Proposal Due Date: Extended to February 20, 2026, at 2:00 PM Eastern.
- Sheet VF100 - Existing Conditions Plan: The existing water pipe and valve routing was changed to route further to the east.
- Sheet CD100 - Demolition Plan: Water line demolition was updated to align with the new existing and proposed water line location.
- Sheet CU100 - Utility Plan: The proposed water building connection now routes directly north instead of east to north, and the backflow preventer was moved accordingly.
- Exhibit A-1: Includes an exhibit to communicate changes regarding the laydown area location, which is now approximately 5 miles closer to the project site.
- Removed Sections: Sections 09 84 33 (Sound-Absorbing Wall Units) and 10 75 00 (Flagpoles) are to be disregarded as they are not part of this project.
Contract & Timeline
- Opportunity Type: Solicitation (Amendment 0003)
- Product/Service Code: Y1JZ (Construction Of Miscellaneous Buildings)
- Set-Aside: None specified
- New Proposal Due: February 20, 2026, 2:00 PM Eastern
- Projnet Availability: Open until February 12, 2026, 12:00 AM Eastern Time
- Amendment Published: February 10, 2026
Additional Notes
All other terms and conditions of the original solicitation are presumed to remain in effect unless explicitly modified by this amendment. Offerors should review the full amendment for complete details and acknowledge all amendments in their proposals.