YELL: WASTEWATER TREATMENT PLC AND HMI PROGRAMMING

SOL #: 140P1426Q0071Solicitation

Overview

Buyer

Interior
National Park Service
IMR NORTHERN ROCKIES(12200)
YELWSTN NL PK, WY, 82190, United States

Place of Performance

Place of performance not available

NAICS

Engineering Services (541330)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Water Purification And Sewage Treatment Equipment (J046)

Set Aside

No set aside specified

Timeline

1
Posted
May 5, 2026
2
Submission Deadline
May 26, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Park Service (NPS), specifically IMR Northern Rockies, is soliciting proposals for Wastewater Treatment PLC and HMI Programming Upgrades at the Canyon Village Wastewater Treatment Plant in Yellowstone National Park. This is a 100% Total Small Business Set-Aside for a firm-fixed-price contract to replace obsolete hardware and modernize control software. Proposals are due May 26, 2026.

Scope of Work

This opportunity requires upgrading the Programmable Logic Controller (PLC) and Human Machine Interface (HMI) systems. Key tasks include:

  • Replacing obsolete PLC hardware components (CPU, ERM cards).
  • Developing a fully upgraded, functional ladder logic-based program using Automation Direct's "Do-More Designer" software, replicating current system operations.
  • Creating new HMI programs using Automation Direct's "C-More" software, utilizing the existing HMI's layout and design.
  • Performing live function and operation tests with park personnel.
  • Providing digital copies of all new operational programs, schematics, as-builts, and address tags. The upgraded system must ensure improved reliability, maintainability, and long-term operational sustainability, with secure communication compatible with existing park infrastructure. The Park Service will provide new hardware and current system documentation.

Contract Details

  • Contract Type: Firm-Fixed-Price
  • Period of Performance: October 1, 2026, to November 1, 2026. All work must be completed by November 1, 2026.
  • Place of Performance: Canyon Wastewater Treatment Plant, Yellowstone National Park.
  • Set-Aside: 100% Total Small Business Set-Aside
  • NAICS Code: 541330 – Engineering Services
  • Small Business Size Standard: $25.5 Million
  • Applicable Regulations: Service Contract Labor Standards (SCA) applies, with a Wage Determination (No. 2015-5407) provided.

Submission & Evaluation

  • Offer Due Date: May 26, 2026, 12:00 PM MDT
  • Submission Method: Email proposals to the contracting specialist, Kiara Stewart, at kiara_stewart@ios.doi.gov.
  • Questions Due: 7 business days prior to the due date, submitted in writing.
  • Evaluation Factors: Award will be based on the best value to the government, considering:
    • Price
    • Technical Ability: Factual documentation of the firm's ability to meet specifications and SOW qualifications.
    • Prior Experience: Factual documentation or narrative of at least two (2) recent projects (past 5 years) of similar size and scope.
  • Requirements: Offerors must be registered in the System for Award Management (SAM). Electronic invoicing via IPP is required.

People

Points of Contact

Files

Files

Download
Download
Download

Versions

Version 1Viewing
Solicitation
Posted: May 5, 2026
YELL: WASTEWATER TREATMENT PLC AND HMI PROGRAMMING | GovScope