Z--YOSE-INSTALL FIRE SPRINKLERS AT WAQ 4065
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Interior, National Park Service (NPS), is requesting quotes (RFQ) for the installation of a Residential Fire Sprinkler System at a residence within Yosemite National Park. This opportunity is a Total Small Business Set-Aside. Proposals are due by February 10, 2026, at 12:00 P.M. Pacific Standard Time (PST).
Scope of Work
The selected contractor will be responsible for providing all mobilization, labor, supervision, materials, equipment, transportation, site rehabilitation, clean-up, and demobilization necessary for the installation of the fire sprinkler system. The work must be performed in accordance with the attached Statement of Work (SOW). Permit drawings/as-builts are required for NPS permit purposes.
Contract Details
- Opportunity Type: Request for Quotation (RFQ) / Solicitation
- Contract Type: Firm Fixed-Price (FFP), Single Award Contract
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- NAICS Code: 238220 (Small Business Size Standard: $19.0 million)
- Construction Magnitude: Less than $25,000
- Period of Performance: 60 calendar days after receipt of order/notice to proceed.
Submission & Evaluation
- Proposals Due: February 10, 2026, at 12:00 P.M. PST.
- Submission Method: Only emailed proposals will be accepted.
- Proposal Validity: Proposals must be valid for a minimum of 60 days.
- Evaluation Criteria: Award will be made to the offeror providing the best value, based on a comparative evaluation of Price, Technical capability, and Prior Experience.
- Registration: All interested parties must be registered in the System for Award Management (SAM).
- Pricing: Bidders must use the provided Contract Price Schedule (Attachment 1) to submit lump sum quotes for Materials, Labor, and Overhead & Profit.
- Bonds: Performance and payment bonds are not required.
Key Dates & Contacts
- Questions Due: January 22, 2026.
- Contact: Brian Roppolo (brian_roppolo@nps.gov). All questions will be answered via amendment on SAM.gov.
- Site Visit: Details are available on page 17 of the solicitation.
Important Attachments & Amendments
- Amendment 0002 (dated 2026-01-27): Extended the proposal due date to February 10, 2026, and included an updated Wage Determination.
- Wage Determination (CA20260018, effective 2026-01-23): Crucial for estimating labor costs, outlining prevailing wage rates for various construction trades in California counties.
- Map and Building Layout (Attachment 3): Provides visual context of the residence, though not to scale.
- RFI and Answers V1 (Attachment 5): Clarifies requirements for permit drawings and water flow information.