YXTK 13-1806 Repair Electrical Distribution Lines, Feeder 5, Ascension Auxiliary Airfield (AAAF), South Atlantic Ocean
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Amendment 3:
The purpose of this Amendment is to change the required bid submission date and bid opening date to allow the Government additional time needed for responding to contractor submitted questions. Government responses to contractor questions will be provided in a subsequent amendment.
Amendment 2:
The purpose of this Amendment is to (1) Revise the required bid submission date as reflected in SF1442 Block 13a to 16 December, 2025, at 9:00 AM local time, (2) Update the USTRANSCOM airfare rate listed in Section C, Para 5.2 to reflect the FY26 rate of $3,238 (one-way), (3) Update Section J, Attachment 9, 2025-2026 Ascension Flight Schedule. Government responses to contractor questions will be provided in a subsequent amendment.
Amendment 1:
The purpose of this Amendment is to extend the deadline for offers due from 6 November 2025 to now reflect 8 December 2025. All other terms and conditions remain unchanged.
Construction. Contractor shall provide all labor, equipment, and materials to repair by replacement the existing overhead Feeder 5 with new overhead lines and poles. Project scope includes removal of overhead electrical distribution lines, poles, pole hardware, guy cables/anchors, and electrical equipment. Installation of new overhead open wire and triplex circuit including all poles, pole hardware, guy cables/anchors, and electrical equipment. Terminate and install new primary feeder wires and cable. Install new Load Break Switch, manholes, and underground duct bank near Hogan's Bypass. New underground duct banks and manholes will be installed to allow the new Feeder 5 distribution lines to travel underneath roads without providing a clearance issue for construction vehicles.
Location: Ascension Auxiliary Airfield (AAAF), South Atlantic Ocean.