BADL REHAB CEDAR LODGE ROAD
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The National Park Service (NPS), specifically the Department of the Interior, has issued an Invitation for Bids (IFB) for construction services to rehabilitate the Cedar Lodge Road at Badlands National Park, Interior, SD. This opportunity is a Total Small Business Set-Aside and seeks a firm-fixed-price contract. Bids are due March 24, 2026, at 1:00 PM Mountain Daylight Time.
Project Scope
The project involves the rehabilitation of the Cedar Pass Lodge Cabin area roadway, which includes:
- Replacement of existing granular surfaced roadway.
- Minor grading and installation of approximately 450 tons of new granular surfaced roadway.
- Excavation and hauling of 3,200 cubic yards of material to a park-provided disposal site.
- Construction of an earthen berm using 900 cubic yards of haul-on material.
- Improvements to the Cedar Pass East Drainage to mitigate flooding issues.
Contract Details
- Contract Type: Firm-Fixed Price Construction Contract (IFB).
- NAICS Code: 237310 (Highway, Street, and Bridge Construction) with a $45 million size standard.
- Period of Performance: 120 calendar days from the Notice to Proceed. Work is anticipated to start August 17, 2026, and end November 6, 2026, for Phase 1 (Ditch and Berm Work: 81 days; Road and Grading Work: 18 days). Remaining work may restart in Spring 2027 (Phase 2: 39 days) if weather causes disruptions. Work near occupied cabins has specific time restrictions.
- Estimated Value: Not explicitly stated, but a bid guarantee of 20% (not to exceed $3M) is required.
Key Requirements & Submission
- Mandatory Site Visit: March 05, 2026, at 10:00 a.m. Mountain Daylight Time. RSVP is required.
- Questions Due: No later than 3 days after the site visit.
- Bid Submission: Via email to
nekota_mabobids@nps.govby March 24, 2026, at 1:00 PM MDT. - Bid Package: Must include SF1442, bid bond, and a Limitations on Subcontracting worksheet.
- Registration: Offerors must have a UEI number, be registered and active in SAM.gov, and have current Online Representations and Certifications by the solicitation close date.
- Wage Rates: Construction Wage Rate Requirements for Pennington County, South Dakota, apply (General Decision SD20260001).
- Submittals: A comprehensive submittal list details required documents, reports, and plans throughout the project lifecycle.
Evaluation Criteria
Award will be made to the responsible bidder whose bid is most advantageous to the Government, considering only price and price-related factors.
Important Attachments
Bidders should review detailed engineering drawings, project specifications, the Period of Performance Addendum, the Submittal List, the Wage Determination, and the Limitations on Subcontracting Report for comprehensive project understanding and compliance.