Z--BROCK RESERVOIR GATE REPLACEMENT/REPAIRS

SOL #: 140R3026R0004Solicitation

Overview

Buyer

Interior
Bureau Of Reclamation
LOWER COLORADO REGIONAL OFFICE
BOULDER CITY, NV, 89005, United States

Place of Performance

Place of performance not available

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Maintenance Of Canals (Z1KB)

Set Aside

No set aside specified

Timeline

1
Posted
Dec 10, 2025
2
Last Updated
Mar 13, 2026
3
Submission Deadline
Feb 17, 2026, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Interior, Bureau of Reclamation, is soliciting proposals for Brock Reservoir Gate Replacement/Repairs in Imperial County, California. This Firm Fixed-Price Construction opportunity, valued between $5M and $10M, involves replacing eight slide gates and associated infrastructure. This is an Unrestricted (Full and Open Competition) procurement. Proposals are due February 17, 2026.

Scope of Work

This project focuses on replacing eight slide gates at the Warren H. Brock Reservoir that have reached the end of their service life. The scope includes:

  • Replacement of six (6) 10-foot by 10-foot and two (2) 10-foot by 7-foot cast iron slide gates with new 316L stainless-steel gates.
  • Installation of new gear boxes, actuators, stem protection, and associated components.
  • Media-blasting and recoating of existing cast-iron thimbles.
  • Reuse or installation of new conduit and power wiring from the Control Building to each gate.
  • Connection of new gate actuators to the existing facility control system.
  • Recoating of existing stop log guides.
  • Installation of a new cathodic protection system and associated electrical components.
  • Removal and replacement of water level instruments, interior/exterior LED light fixtures, a security camera, a 150 kW diesel power generator, and an emergency generator automatic transfer switch.
  • An optional CLIN for an additional three gates is included.

Contract & Timeline

  • Contract Type: Firm Fixed-Price Construction
  • Estimated Value: $5,000,000 - $10,000,000
  • Period of Performance: April 2026 through September 2027, or 547 calendar days from Notice to Proceed. Includes a full water outage (Nov 2026 – Feb 2027) and 50% capacity operation (Mar 2027 – Jun 2027).
  • Place of Performance: Brock Reservoir, Imperial County, California.
  • Site Visit: February 5, 2026, 8:00 a.m. PT (RSVP by Feb 3, 2026).
  • Questions Due: February 9, 2026, 2:00 p.m. PT.
  • Proposals Due: February 17, 2026, 2:00 p.m. local time.

Evaluation & Requirements

Proposals will be evaluated on Technical Plan for Construction, Past Performance, Management Approach, Small Business Participation Plan, and Price. Technical factors are significantly more important than price.

  • Set-Aside: Unrestricted (Full and Open Competition).
  • NAICS: 237990 (Other Heavy and Civil Engineering Construction, $45M size standard).
  • Bonds: A bid bond, performance bond (SF25), and payment bond (SF25A) are required. Performance and Payment Bonds must be furnished within 10 calendar days after award. An offer guarantee is also required.
  • Special Requirements: Compliance with Reclamation Safety and Health Standards (RSHS), OSHA, California air quality programs, and a Water Management Plan. A Subcontracting Plan (FAR 52.219-9) is required. Wage Determination CA20260002 applies.

Contact Information

People

Points of Contact

Gallardo, LuisPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 8
Award Notice
Posted: Mar 13, 2026
View
Version 7
Solicitation
Posted: Feb 19, 2026
View
Version 6
Solicitation
Posted: Feb 17, 2026
View
Version 5
Solicitation
Posted: Feb 13, 2026
View
Version 4Viewing
Solicitation
Posted: Jan 12, 2026
Version 3
Solicitation
Posted: Jan 12, 2026
View
Version 2
Solicitation
Posted: Jan 12, 2026
View
Version 1
Pre-Solicitation
Posted: Dec 10, 2025
View