Z--Decentralized Compressed Air Distribution System Plus OPTION 1 Naval Submarine Base New London, Groton CT
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Decentralized Compressed Air Distribution System Plus OPTION 1 Naval Submarine Base New London, Groton CT
This solicitation is under the ML-C00048, 8(a) MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC), FOR GENERAL CONSTRUCTION OF FACILITIES, NAVAL SUBMARINE BASE NEW LONDON, GROTON CT. ONLY MACC CONTRACTS HOLDERS ML-C00048 may participate in this solicitation.
The base bid work is inclusive of the removal, replacement and structural support of three compressors and all associated parts to building 29. Provide and install a new compressor at pier 15 and one adjacent to building 478 as well as provide ten mobile diesel emergency compressors. The Option 1 work includes removal of steam turbine TG-5, its piping, equipment and installation of double ended substation N3.
The existing Supervisory Control and Data Acquisition (SCADA) system will be modified to monitor the new Substation N3 along with transferring the south gas compressor load from N2 substation to NS substation in addition to system wide power system analysis with readjustment testing. Work for each phase as projected is indicated on drawings.
Specifications and Drawings:
Base Bid: Attachments labeled 1546625 relates to the specification and drawings for the base portion of the contract.
Option 1: Attachments labeled 1560262 relate to the specification and drawings for Option 1. This specification includes a Base Bid. This Base Bid is NOT included in this solicitation. However, the Option 1 specifications and drawings are integrated in some parts into the base bid of these specifications and are needed to assess the “Option 1 Requirements�.
Proposal Requirement: A full-time site Superintendent and a full-time Quality Control (QC)/ Site Safety and Health Officer (SSHO) are required to be on site for the duration of the project.
The Quality Control Manager may serve as the Site Safety and Health Officer(SSHO) as long as all requirements in Section 01 35 26 (Governmental Safety Requirements) are met.