Z--DK-AO Heart Butte Safety of Dam Modification
SOL #: DOIRFBO240024Special Notice
Overview
Buyer
Interior
Bureau Of Reclamation
GREAT PLAINS REGIONAL OFFICE
BILLINGS, MT, 59101, United States
Place of Performance
Place of performance not available
NAICS
Other Heavy and Civil Engineering Construction (237990)
PSC
Repair Or Alteration Of Dams (Z2KA)
Set Aside
No set aside specified
Original Source
Timeline
1
Posted
Jul 31, 2024
2
Last Updated
Oct 3, 2024
3
Action Date
Oct 11, 2024, 11:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Please see the following attachments for the full Industry Day announcement:
1) Industry Day Notice
2) Heart Butte Modification Draft Construction Plans (June 2024)
3) 2018-2021 Heart Butte Dam Corrective Action Study Geologic Exploration Report (must be requested separately from the Contracting Officer due to the size of the file)
1) Industry Day Notice
2) Heart Butte Modification Draft Construction Plans (June 2024)
3) 2018-2021 Heart Butte Dam Corrective Action Study Geologic Exploration Report (must be requested separately from the Contracting Officer due to the size of the file)
People
Points of Contact
Frost, MitchellPRIMARY
Files
Files
No files attached to this opportunity
Versions
Version 2
Sources Sought
Posted: Oct 3, 2024
Version 1Viewing
Special Notice
Posted: Jul 31, 2024