Z--DK-AO Heart Butte Safety of Dam Modification

SOL #: DOIRFBO240024Special Notice

Overview

Buyer

Interior
Bureau Of Reclamation
GREAT PLAINS REGIONAL OFFICE
BILLINGS, MT, 59101, United States

Place of Performance

Place of performance not available

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Repair Or Alteration Of Dams (Z2KA)

Set Aside

No set aside specified

Timeline

1
Posted
Jul 31, 2024
2
Last Updated
Oct 3, 2024
3
Action Date
Oct 11, 2024, 11:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Please see the following attachments for the full Industry Day announcement:
1) Industry Day Notice
2) Heart Butte Modification Draft Construction Plans (June 2024)
3) 2018-2021 Heart Butte Dam Corrective Action Study Geologic Exploration Report (must be requested separately from the Contracting Officer due to the size of the file)

People

Points of Contact

Frost, MitchellPRIMARY

Files

Files

No files attached to this opportunity

Versions

Version 2
Sources Sought
Posted: Oct 3, 2024
View
Version 1Viewing
Special Notice
Posted: Jul 31, 2024
Z--DK-AO Heart Butte Safety of Dams Modification | GovScope