Z--FOG SEAL AND RESTRIPE 9.6 MILES OF PINTO

SOL #: 140P8126B0001Solicitation

Overview

Buyer

Interior
National Park Service
PWR LAME(81000)
BOULDER CITY, NV, 89005, United States

Place of Performance

Place of performance not available

NAICS

Highway (237310)

PSC

Maintenance Of Highways/Roads/Streets/Bridges/Railways (Z1LB)

Set Aside

No set aside specified

Timeline

1
Posted
Mar 11, 2026
2
Last Updated
Apr 22, 2026
3
Submission Deadline
Apr 28, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Interior, National Park Service, is soliciting bids for fog sealing and restriping 9.6 miles of Pinto Basin Road within Joshua Tree National Park, CA. This is a 100% Small Business Set-Aside Invitation for Bid (IFB), with an estimated project magnitude between $300,000 and $500,000. Bids are due by April 28, 2026, at 2 PM PDT.

Scope of Work

The project involves applying a fog seal (CSS-1H asphalt emulsion at 0.10 to 0.15 gallons per square yard) and subsequent restriping of 9.6 miles of Pinto Basin Road. The total area for fog sealing is approximately 1,368,576 square feet (152,064 square yards). Restriping includes 4-inch wide centerline and edge lines, and 3-inch wide black contrast striping, applied in two coats with reflective beads. Industry-standard long line striping trucks are required. Fog sealing will also extend 50 feet into intersections of parking lots and cover all paved pullouts. Curbed areas near the Cottonwood visitor center (300 feet) do not require edge line painting. The contractor is responsible for centerline and edge line striping; park employees will repaint stenciled markings.

Contract & Timeline

  • Contract Type: Firm Fixed Price
  • Set-Aside: 100% Small Business Set-Aside
  • NAICS Code: 237310 (Highway, Street, and Bridge Construction) with a $45M size standard
  • Estimated Value: $300,000 - $500,000
  • Period of Performance: 60 calendar days after Notice to Proceed
  • Bid Due Date: April 28, 2026, 2 PM PDT
  • Bid Opening: April 29, 2026, 2 PM PDT via Microsoft Teams (details provided in Amendment 00001)
  • Published Date: April 22, 2026 (Amendment 00001)

Submission & Evaluation

Bids must be submitted electronically as a single PDF file to PWR_MABO_LAKE_Bid@nps.gov. The bid package must include a completed SF1442 with original signatures, acknowledgment of any amendments, a completed Price Schedule, and a bid guarantee (bid bond required). Offerors must include their SAM registered UIED number. This is a Sealed Bid solicitation, implying award to the lowest responsive and responsible bidder.

Special Requirements

Work will be conducted within Joshua Tree National Park. Public access to roads and parking areas must be maintained, requiring a comprehensive traffic control plan. Road closures are limited to a maximum of 24 hours with specific approval. Work hours are generally 7 a.m. to 4:30 p.m., Monday through Friday. Equipment must be pressure washed and free of exotic species prior to entering the Project Area. Contractors must comply with safety requirements, environmental protection regulations (including a Stormwater Pollution Prevention Plan or Under-An-Acre Pollution Prevention Plan), and prevailing wage rates as specified in Wage Determination CA20260026 for San Bernardino County, CA. Required submittals include a Construction Schedule, Accident Prevention Plan, Waste Management Plan, Quality Control Plan, and Pedestrian/Vehicular Traffic Control Plan.

Attachments

Key attachments include a location printout with specific coordinates, the prevailing wage determination (CA20260026), a template for reporting on Limitation on Subcontracting (LOS) requirements, and guidance on construction contract administration regarding equitable adjustments for change orders.

People

Points of Contact

Bachelier, CarolinePRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download

Versions

Version 3Viewing
Solicitation
Posted: Apr 22, 2026
Version 2
Solicitation
Posted: Mar 26, 2026
View
Version 1
Pre-Solicitation
Posted: Mar 11, 2026
View
Z--FOG SEAL AND RESTRIPE 9.6 MILES OF PINTO | GovScope