GRPO - Mile Creek Stone Trail Bridge
SOL #: 140P6026B0005Solicitation
Overview
Buyer
Interior
National Park Service
MWR MIDWEST REGION(60000)
OMAHA, NE, 68102, United States
Place of Performance
Grand Portage, MN
NAICS
Highway (237310)
PSC
Repair Or Alteration Of Highways/Roads/Streets/Bridges/Railways (Z2LB)
Set Aside
Total Small Business Set-Aside (FAR 19.5) (SBA)
Original Source
Timeline
1
Posted
Apr 27, 2026
2
Last Updated
May 28, 2026
3
Submission Deadline
Jun 29, 2026, 3:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The National Park Service (NPS), specifically the MWR Midwest Region, has issued a Solicitation (IFB) for the GRPO - Mile Creek Stone Trail Bridge project at Grand Portage National Monument, Grand Portage, MN. This project involves enhancing pedestrian access and improving vehicular safety through significant asphalt removal, milling, and new pavement installation. This opportunity is a Total Small Business Set-Aside. Bids are due June 29, 2026, at 10:00 AM CT.
Scope of Work
The project focuses on construction work to improve the historic Mile Creek Stone Bridge area. Key tasks include:
- Pavement Work: Sawcutting and removing approximately 4,472 SF of existing asphalt pavement and aggregate subbase; milling 9,081 SF of existing asphalt (2" depth); removing 3,606 SF of aggregate shoulders; installing 9,081 SF of 2" depth asphalt overlay; installing 1,025 SF of 4" depth asphalt pavement wearing course; installing 700 SF of 6" depth aggregate subbase and filter fabric.
- Site Preparation & Restoration: Scarifying and recompacting subgrade at 6" depth; installing 100 CY of imported topsoil; installing and removing 1,068 LF of silt fence; installing 820 SY of erosion control blankets.
- Site Amenities & Markings: Installing 1 ABA accessible parking sign with bollard; installing 9 concrete wheel stops; installing 706 LF of permanent painted pavement lines; installing 1 ABA permanent painted parking symbol; installing 9 permanent painted pavement letters.
- Protection: Special precautions are required for the designated historic Mile Creek Stone Bridge, historical/archeological fabric, existing utilities, landscaping, and surrounding structures.
Contract Details
- Contract Type: Firm-Fixed Price Invitation for Bid (IFB).
- Estimated Magnitude: Between $100,000 and $250,000.
- Period of Performance: 60 calendar days from the Notice to Proceed. Estimated start is late Summer/Fall 2026, specifically August 1, 2026, to October 1, 2026.
- Set-Aside: 100% Total Small Business Set-Aside (FAR 19.5).
- NAICS Code: 237310 (Highway, Street, and Bridge Construction) with a $45 Million small business size standard.
- Bonds: A bid guarantee of 20% (not to exceed $3M) is required, submitted as Standard Form 24. Performance and Payment bonds will also be required.
- Compliance: Wage Rate requirements are incorporated, and Offerors must comply with Buy American requirements for construction materials.
Submission & Site Visit
- Offer Due Date & Bid Opening: June 29, 2026, at 10:00 AM CT.
- Bid Opening Method: Virtual via conference call (Dial-in: 202-640-1187, Passcode: 614 477 299#).
- Submission Method: Bids must be emailed in PDF format to bridget_parizek@ios.doi.gov.
- Site Visit: An organized site visit is scheduled for June 11, 2026, at 10:00 AM CT at Grand Portage National Monument. Bidders are urged to visit the site.
- Questions Deadline: No later than 5 calendar days following the organized site visit.
Eligibility & Notes
- Offerors must be registered in SAM.gov with an active status under the specified NAICS code.
- Environmental protection measures, noise limitations, and hazardous materials handling procedures must be followed.
- Construction will be restricted between August 3-9, 2026, due to a park scheduled event.
- Mandatory safety meetings and PPE requirements apply.
People
Points of Contact
Parizek, BridgetPRIMARY