GRTE REPLACE HIGHLANDS W&WW

SOL #: 140P1426R0010Solicitation

Overview

Buyer

Interior
National Park Service
IMR NORTHERN ROCKIES(12200)
YELWSTN NL PK, WY, 82190, United States

Place of Performance

Moose, WY

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Repair Or Alteration Of Water Supply Facilities (Z2NE)

Set Aside

Women-Owned Small Business (WOSB) Program Set-Aside (FAR 19.15) (WOSB)

Timeline

1
Posted
Mar 5, 2026
2
Last Updated
May 27, 2026
3
Submission Deadline
Apr 27, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Park Service (NPS), specifically Grand Teton National Park (GRTE), is soliciting proposals for the replacement of Highlands Water and Wastewater Systems (PMIS 249645, 330091) located in Moose, WY. This project is a Women-Owned Small Business (WOSB) Set-Aside with an estimated magnitude between $1,000,000 and $5,000,000. Proposals are due April 27, 2026, by 1500 local time.

Project Scope

The work involves comprehensive replacement of water and wastewater infrastructure at the Highlands Historic District. Key tasks include:

  • Extending the existing Moose water transmission line.
  • Trenching across Cottonwood Creek, requiring diversion and dewatering.
  • Replacing the internal water distribution system and abandoning the existing well.
  • Installing a new wastewater system, including a lift station, septic tank, leach field, and collection piping, while decommissioning the old system.
  • Construction will disturb approximately 2.5 acres within a 4-acre project area, utilizing standard civil equipment. Staging will occur onsite and at the Beaver Creek boneyard. Revegetation efforts will be coordinated with park staff.

Contract Details

  • Contract Type: Firm Fixed Price.
  • Set-Aside: Women-Owned Small Business (WOSB) Program.
  • NAICS Code: 237110, Water and Sewer Line and Related Structures Construction, with a $45M small business size standard.
  • Magnitude: Between $1,000,000 and $5,000,000.
  • Period of Performance: 120 calendar days after Notice to Proceed.
  • Wage Rates: Davis Bacon wage rates apply.
  • Bonds: Performance and Payment bonds are required.
  • Invoicing: Electronic invoicing via Invoice Processing Platform (IPP) is mandatory.

Submission & Evaluation

  • Proposal Submission: Electronically via email, in PDF format, adhering to specific volume and file naming conventions (Volume I – Non-Price Proposal, Volume II – Price Proposal).
  • Offer Due Date: April 27, 2026, by 1500 (hour) local time.
  • Questions Due: No later than 10 calendar days prior to the offer due date, submitted in writing to Molly Lynam (molly_lynam@ios.doi.gov).
  • Evaluation Factors: Technical factors (Past Performance, Project Experience, Key Personnel Experience, Schedule, Safety) and Price. Non-price factors are listed in descending order of importance and are collectively approximately equally important to price.
  • Eligibility: Offerors must be registered in SAM.gov with an "active" status and meet the WOSB set-aside requirements and NAICS size standard.

Key Attachments & Information

  • Construction Drawings & Specifications: Detailed plans for existing/proposed systems, demolition, electrical, water, and sewer components.
  • Geotechnical Report: Provides crucial subsurface soil conditions, potential hazards, and recommendations for excavation and pipe bedding.
  • Bid Schedule: Template for pricing submission, including Base and Option CLINs.
  • Past Performance & Project Experience Forms: Required for evaluation of offeror's capabilities.
  • Limitation on Subcontracting Report Template: Indicates reporting requirements for WOSB compliance.
  • Site Visit: A site visit was held on December 10, 2025; no further site visits are scheduled.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4
Solicitation
Posted: May 27, 2026
View
Version 3Viewing
Solicitation
Posted: May 26, 2026
Version 2
Solicitation
Posted: Mar 27, 2026
View
Version 1
Pre-Solicitation
Posted: Mar 5, 2026
View
Z--GRTE REPLACE HIGHLANDS W&WW | GovScope