Z1DA--537-26-200 FY26 Facility Cooling Improvements

SOL #: 36C25226R0051Solicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
252-NETWORK CONTRACT OFFICE 12 (36C252)
MILWAUKEE, WI, 53214, United States

Place of Performance

Place of performance not available

NAICS

Plumbing (238220)

PSC

Maintenance Of Hospitals And Infirmaries (Z1DA)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)

Timeline

1
Posted
May 6, 2026
2
Last Updated
Jun 4, 2026
3
Submission Deadline
Jul 10, 2026, 3:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Veterans Affairs (VA), specifically the VETERANS AFFAIRS, DEPARTMENT OF / 252-NETWORK CONTRACT OFFICE 12 (36C252), has issued a solicitation for FY26 Facility Cooling Improvements at the Jesse Brown VA Medical Center in Chicago, IL. This project involves significant upgrades and replacements of cooling systems. This is a Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside. Offers are due July 10, 2026, at 10:00 AM CDT.

Scope of Work

The project, titled "FY26 Facility Cooling Improvements," focuses on enhancing environmental conditions at the Jesse Brown VA Medical Center. Key components include:

  • Replacement of six existing APC InRow Cooling units and their corresponding condensing units on the roof of the Damen Bldg.
  • Replacement of the AHU-AC21 serving Nutrition Food and Service, including associated systems, fan coil units, fin tube radiation system, and exhaust fans. This involves demolition of existing HVAC equipment on the Third Floor Roof of Building 1-B.
  • Integration with the Building Automation System (BAS) and provision of temporary cooling during replacement.
  • An Asbestos Reinspection Report (2019) is provided, detailing asbestos-containing materials (ACM) in Buildings 1A, 1B, 11A, and 11B. Bidders must account for potential asbestos abatement, especially for the AHU-AC21 replacement, and ensure safe execution.
  • The contractor must ensure continuous operation of the Medical Center's utilities 24/7 and coordinate all work with the Contracting Officer Representative (COR).
  • Compliance with VHA Directive 1192 (influenza vaccination/masking) and sustainable construction requirements are mandatory.

Contract & Timeline

  • Contract Type: Firm Fixed Price Contract.
  • NAICS Code: 238220 (Plumbing, Heating, and Air-Conditioning Contractors) with a size standard of $19 Million.
  • Estimated Value: $19 Million.
  • Period of Performance: Base CLIN to be completed within 76 days from Notice to Proceed (NTP). The AHU-AC21 replacement (Option CLIN) has been extended to 308 days from NTP.
  • Published Date: June 4, 2026.
  • Offer Due Date: July 10, 2026, at 10:00 AM CDT (extended by amendment).

Eligibility / Set-Aside

This procurement is a 100% set-aside for Verified Service-Disabled Veteran-Owned Small Businesses (SDVOSB). Offerors must be eligible under VAAR subpart 819.70 and meet the assigned NAICS code size standard.

Submission & Evaluation

  • Site Visit: Wednesday, May 6, 2026, at 0900 Local Time (Note: This date has passed).
  • RFQ Questions Deadline: Wednesday, May 13, 2026, 1700 Local Time (Note: This date has passed).
  • Offer Due Date: July 10, 2026, at 10:00 AM CDT.
  • Evaluation factors will be outlined in FAR 52.212-2.

Amendments

Several amendments have been issued:

  • Addendum 1 to the Project Manual, AHU-AC21 Schedule, and Annotated Drawings. Key changes include: Period of Performance for the AHU-AC21 replacement extended from 245 to 308 days from NTP; VA review time for Phase 3 Preconstruction increased to 14 calendar days; Hydronic distribution for AC-21 changed from 60% to 30% propylene glycol; the entire Project Manual has been replaced; and numerous specific notes, captions, schedules, and details within various drawing sheets have been modified.
  • Amendment 0001 extends the deadline for receipt of offers to July 10, 2026, 10:00 AM CDT, and also extended the RFI submission deadline.

People

Points of Contact

Ryan J McMillinContracting OfficerPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 3Viewing
Solicitation
Posted: Jun 4, 2026
Version 2
Solicitation
Posted: May 6, 2026
View
Version 1
Pre-Solicitation
Posted: May 6, 2026
View