Z1DA--PN: 568A4-23-207, Replace 1 North HVAC System (HS) 36C263-26-AP-1604
SOL #: 36C26326B0021Solicitation
Overview
Buyer
Veterans Affairs
Veterans Affairs, Department Of
NETWORK CONTRACT OFFICE 23 (36C263)
Saint Paul, MN, 55101, United States
Place of Performance
Hot Springs, SD
NAICS
Plumbing (238220)
PSC
Maintenance Of Hospitals And Infirmaries (Z1DA)
Set Aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)
Original Source
Timeline
1
Posted
Feb 12, 2026
2
Last Updated
Apr 28, 2026
3
Submission Deadline
Apr 30, 2026, 3:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of Veterans Affairs (VA) is soliciting bids for Project 568A4-23-207: Replace 1 North HVAC System at the VA Black Hills Health Care System (VABHHCS) Hot Springs Campus, SD. This is a Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside with an estimated value between $2,000,000 and $5,000,000. The project involves comprehensive HVAC system replacement and associated upgrades. Offers are due by April 30, 2026, at 10:00 AM CDT.
Scope of Work
The contractor will replace the existing air handling unit (AHU) serving Ward 1 North in hospital building 12. Key tasks include:
- Replacement of the existing AHU and condensing unit with a new split system AHU and condensing unit.
- Replacement of 15-20 Variable Air Volume (VAV) boxes and conversion to direct digital controls (DDC).
- Conversion of all new equipment to DDC, connecting to the central automation system.
- Replacement of heating water pipe distribution mains, heat exchanger, pumps, and controls.
- Replacement of refrigerant, heating hot water, and steam/condensate piping.
- Replacement of ductwork distribution mains from AHU to terminal devices.
- Temporary cooling of spaces during construction using window/self-contained heat pumps.
- Upsizing of existing electrical panel 1N-N3 from 150A to 250A, including upstream breaker, conduit, and conductor replacement.
- Replacement of all safety switches/disconnects and conducting feeders serving the HVAC system.
- Removal and replacement of existing ceiling tiles, grid, diffusers, smoke detectors, speakers, and lighting in impacted areas.
Contract Details
- Contract Type: Firm-Fixed-Price construction contract.
- Period of Performance: 365 calendar days from the date of Notice to Proceed (NTP).
- Estimated Value: $2,000,000.00 to $5,000,000.00.
- Place of Performance: VA Black Hills Health Care System, Hot Springs Campus, 500 North 5th Street, Hot Springs, SD 57747.
Submission & Evaluation
- Offers Due: April 30, 2026, at 10:00 AM CDT.
- Submission Method: Electronically via email to jocelyn.swim@va.gov and angela.frost2@va.gov. Subject line must be: PN: 568A4-23-207, Replace 1 North HVAC System.
- Evaluation: Award will be based on the lowest bid confirmed as fair and reasonable; no discussions are anticipated.
- Required Submissions: A bid guarantee (SF 24) is required with the offer. Performance and payment bonds (SF 25 and SF 25A) are required within 10 calendar days after award.
- Site Visit: A formal site visit was held on March 30, 2026. Contractor walk-throughs outside of this meeting are not allowed.
- Technical Questions: Were due by April 6, 2026.
Eligibility & Requirements
- Set-Aside: 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside. Offerors must be registered and certified as an SDVOSB in the SBA certification database (https://veterans.certify.sba.gov) at the time of bid submission.
- NAICS Code: 238220 (Plumbing, Heating, and Air-Conditioning Contractors) with a small business size standard of $19.0 million.
- Limitations on Subcontracting: Offerors must submit VAAR 852.219-75 Certificate of Compliance, certifying adherence to subcontracting limits (not more than 85% to non-SDVOSB firms for general construction, excluding materials).
- Safety Requirements: Bidders must submit information on past safety/environmental violations (OSHA/EPA) and their Experience Modification Rate (EMR), including a completed "PRE-AWARD CONTRACTOR SAFETY AND ENVIRONMENTAL RECORD EVALUATION FORM."
- Personnel: A dedicated on-site superintendent is required. A Safety and Health Official (SSHO) must be assigned solely to oversee safety and be a separate individual from the superintendent and quality control manager.
- Software: Contractor shall provide a subscription service to construction management software (ProCore or Submittal Exchange) for submittals, RFIs, and daily logs.
- Wage Rates: Adherence to FAR 52.222-6 (Davis Bacon Act) is required, with prevailing wage rates specified in General Decision Number SD20260022.
- Training: Contractors must comply with all training requirements, obtain PIV badges, undergo background checks, and complete TMS 20939 VA Privacy Training for Personnel document.
Key Clarifications
- Contractors can work on multiple phases consistent with working hour requirements.
- The contractor is not responsible for providing UL fire-resistant joint systems at unforeseen penetrations.
- Existing suspended acoustical ceiling tile and grid are to be replaced with new.
- Seismic restraint requirements are relevant, as Hot Springs is seismic design class B.
- The VA will relocate furniture; material staging is not available within the building.
- The new Building Management System (BMS) will be standalone but integrated with the central system under a separate project.
- Graphic display for the BAS should be in the mechanical room; the secure work area fence is exterior.
- No rooms require an escort; a construction key will grant access to the mechanical room.
- The fire sprinkler contractor is responsible for reconfiguring piping per NFPA 13.
People
Points of Contact
Jocelyn J SwimContract SpecialistPRIMARY