PN: 636A8-24-003, Correct Lightning Protection and Grounding
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of Veterans Affairs (VA) is soliciting proposals for Project Number 636A8-24-003, Correct Lightning Protection and Grounding at the Iowa City VA Health Care System in Iowa City, IA. This Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside opportunity involves upgrading outdated lightning protection systems and improving grounding to re-establish Underwriters Laboratory (UL) ratings for all campus buildings. Proposals are due February 25, 2026, at 10:00 AM CT.
Project Overview
This solicitation, 36C26326B0008, seeks a contractor to provide all necessary labor, materials, and equipment to correct and upgrade the lightning protection and grounding systems across the Iowa City VAMC campus. The primary objective is to ensure the operational reliability and safety of the facilities by bringing the systems up to current UL standards.
Scope of Work
The contractor will be responsible for:
- Providing all labor, materials, and equipment for the lightning protection and grounding upgrade.
- Re-establishing UL ratings for each building through improved grounding.
- Performing work according to detailed construction drawings and specifications, including revised documents from Amendment 0006.
- Coordinating work with VA staff and adhering to defined phasing requirements to maintain existing device operation.
- Upgrading and installing fire alarm controllers to connect with the building automation control system.
- Demolishing existing lightning protection systems and installing new ones, including air terminals, conductors, and grounding systems.
- Replacing existing main service surge suppressive devices.
- Verifying field conditions for grounding pathways and railing thickness if used as conductors.
Key Requirements & Deliverables
- A dedicated project superintendent is required for the duration of the 365-calendar-day performance period.
- Compliance with prevailing wage rates as per the latest Wage Determination IA20260068.
- Submission of a Bid Bond with the proposal; Payment and Performance Bonds are also required.
- Mandatory VA Privacy Training for personnel without direct access to VA computer systems or sensitive information.
- Adherence to NARA Records Management Obligations for all Federal records.
- Submission of Safety or Environmental Violations and EMR Information, including OSHA 300/300a forms. An EMR above 1.0 requires a written explanation.
- A VAAR 852.219-75 Limitations on Subcontracting Certificate of Compliance is mandatory; for general construction, no more than 85% of the amount paid by the government can go to non-SDVOSB firms.
- Deliverables include product data, cable samples, as-built drawings, a narrative of installation difficulties, certification reports, and a system warranty.
Contract Details
- Contract Type: Firm-Fixed-Price
- Estimated Value: Between $1,000,000 and $2,000,000
- Period of Performance: 365 calendar days after Notice to Proceed (NTP). Work primarily during business hours (8:00 a.m. to 4:00 p.m.), with potential for after-hours/weekend work.
- NAICS Code: 238210 (Electrical Contractors and Other Wiring Installation Contractors) with a $19.0 Million small business size standard.
- Place of Performance: Iowa City VA Health Care System, 601 Hwy 6 West, Iowa City, Iowa.
Set-Aside & Eligibility
This is a total set-aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) concerns. Offerors must be verified as an SDVOSB in the SBA certification database at the time of proposal submission and award. Failure to submit the required Limitations on Subcontracting certification will result in ineligibility.
Submission & Evaluation
Proposals must be submitted via email to both angela.frost2@va.gov and michael.freeman3@va.gov. The award will be based on the most advantageous bid to the government, primarily considering price. Offerors must acknowledge all amendments, including Addendum Number 1, on their Bid Form.
Important Notes
Amendment 0006, posted February 11, 2026, extended the bid opening date and updated points of contact and several key documents. Bidders must review Addendum Number 1, revised Specifications, Drawings, and Scope of Work for updated requirements. All questions were due by December 10, 2025.