Z1DA--VISN 20 General Construction MATOC Replacement Construction Services
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
The purpose of this amendment is to accomplish the following:
1. Proposal due date is extended to July 1, 2025 at 3:00 PM PST.
2. Question period is closed. Additional questions will not be accepted.
3. Attachment 1 to this amendment are the questions/answers regarding the seed project.
4. In amendment 0005 you were provided a copy of VAAR 852.219-75, VA Notice of LOS Certification (JAN 2023)(DEVIATION). We have attached it to this amendment again to ensure each offeror has the correct version. In order for your proposal to be considered you MUST:
- Use the VAAR 852.219-75 (JAN 2023)(DEVIATION) version provided in either amendment 0005 or this amendment. The 2022 version of this clause, or any other version/format will not be acceptable.
- Return the ENTIRE clause, in full text, with your proposal.
- Review paragraph (d) to ensure a complete understanding of the requirement; AND
- Complete the certification, inserting name of offeror in BOTH fill in’s, printed name of signee, printed title of signee, signature, date and company name and address. this certification MUST be completed properly and returned with your proposal.
5. Solicitation attachment 6 Seed Project Price Breakout Revised 6.16.25 is provided for your use. Additional divisions added.
6. The following attachments are provided to further clarify questions/answers provided:
- Attachment 3, Red Line As Built – existing raceways
- Attachment 4, Existing Plumbing P2.4
- Attachment 5, Ceiling Plan A7.1
- Attachment 6, Specification Section 232500 HVAC Water Treatment
- Attachment 7, Specification Section 275223 Nurses Call
- Attachment 8, Vancouver Site for 648-22-100 Dental
*************END OF AMENDMENT*************
See attached document: Attachment 6 Seed Project Price Breakout Revised 6.16.25.
See attached document: 36C26024R0087 0010 Attachment 1 Seed Project Questions and Answers 6.16.25.
See attached document: 36C26024R0087 0010 Attachment 2 VAAR 852.219-75 VA Notice of LOS - Certicate of Compliance for Services and Construction Jan 2023 Deviation.
See attached document: 36C26024R0087 0010 Attachment 3 Red Line As builts - existing receway.
See attached document: 36C26024R0087 0010 Attachment 4 Existing Plumbing - P2.4.
See attached document: 36C26024R0087 0010 Attachment 5 Ceiling Plan -A7.1.
See attached document: 36C26024R0087 0010 Attachment 6, Specification Section 232500 HVAC Water Treatment.
See attached document: 36C26024R0087 0010 Attachment 7, Specification Section 275223 Nurse call.
See attached document: 36C26024R0087 0010 Attachment 8, VANCOUVER SITE for 648-22-100 Dental.