Z1NB--Boiler replacement

SOL #: 36C24626B0020Pre-Solicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
246-NETWORK CONTRACTING OFFICE 6 (36C246)
HAMPTON, VA, 23667, United States

Place of Performance

Durham, North Carolina

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Maintenance Of Heating And Cooling Plants (Z1NB)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)

Timeline

1
Posted
Jan 20, 2026
2
Last Updated
Apr 14, 2026
3
Response Deadline
Jul 20, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Veterans Affairs (VA), specifically Network Contracting Office 6 (NCO 6), intends to issue an Invitation for Bid (IFB) for Boiler Replacement services at the Durham VA Health Care System in Durham, NC. This project involves the installation of three new 600 HP fire tube boilers and associated infrastructure. This opportunity is a Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside. The solicitation is expected on or about May 5, 2026, with bids due by July 20, 2026.

Scope of Work

The project, identified as 558-22-152, requires professional construction services for the replacement of boilers. Key deliverables include:

  • Installation of three new 600 HP fire tube boilers, each providing 22,500 pounds per hour of 80 PSIG steam to meet a total site requirement of 45,000 pounds per hour.
  • Provision of economizers and stacks for each boiler.
  • Boilers must feature dual fuel burners, with Natural Gas as the primary fuel and Fuel Oil 2 as the redundant fuel.
  • Installation of a propane tank and air compressor for fuel oil ignition and atomization.
  • Work locations include Building 7 (Boiler Plant), Building 9 (Chiller Plant), Building 24 (Temporary Boiler Plant), and associated East/West parking lot/loading dock areas.

Contract & Timeline

  • Contract Type: Firm Fixed-Price (IFB)
  • Estimated Construction Magnitude: Between $10,000,000.00 and $20,000,000.00
  • Period of Performance: 547 calendar days
  • NAICS Code: 236220 (Commercial and Institutional Building Construction)
  • Size Standard: $45.0 Million
  • Set-Aside: Service-Disabled Veteran-Owned Small Business (SDVOSB)
  • Solicitation Availability: On or about May 5, 2026, on SAM.gov.
  • Bids Due: July 20, 2026, by 6:00 PM EDT.
  • Published Date: April 14, 2026.

Submission & Evaluation

  • Solicitation materials, including specifications, drawings, and amendments, will be posted exclusively on SAM.gov.
  • Bids will be due approximately 30 days after the solicitation issuance, with the final deadline being July 20, 2026.
  • Only one site visit will be scheduled; details will be provided in the solicitation.
  • All non-responsive bids will be rejected.
  • Prospective contractors must be registered and active in the System for Award Management (SAM.gov) database to be eligible for award. Online Representations and Certifications Applications (ORCA) apply.

Additional Notes

This notice is for informational purposes only and is not an invitation for bids. The Government is not obligated to issue a solicitation. Vendors are responsible for obtaining and acknowledging all amendments. All questions regarding this announcement and future project announcements must be emailed to the Primary Contract Specialist, Alice Custis, at alice.custis@va.gov. Telephone requests for bidding material will not be accepted.

People

Points of Contact

Alice CustisContract SpecialistPRIMARY

Files

Files

View
Download
Download
View

Versions

Version 3Viewing
Pre-Solicitation
Posted: Apr 14, 2026
Version 2
Sources Sought
Posted: Jan 21, 2026
View
Version 1
Sources Sought
Posted: Jan 20, 2026
View
Z1NB--Boiler replacement | GovScope