Z2DA--519-23-908 EHRM Tier 2 Data Center Construction - Big Spring

SOL #: 36C77626C0028Award Notice

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
PCAC (36C776)
INDEPENDENCE, OH, 44131, United States

Place of Performance

Big Spring, TX

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Hospitals And Infirmaries (Z2DA)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)

Timeline

1
Posted
Mar 19, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Veterans Affairs (VA) has awarded V LINE SERVICES L.L.C. a contract for EHRM Tier 2 Data Center Construction in Big Spring, TX. This award, valued at $4,329,750.00, was made on March 17, 2026, under a Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside.

Project Details

This contract is for the construction of an EHRM Tier 2 Data Center located in Big Spring, Texas. The project falls under Product Service Code Z2DA (Repair Or Alteration Of Hospitals And Infirmaries) and NAICS Code 236220.

Award Information

  • Awardee: V LINE SERVICES L.L.C.
  • UEI: T1EKCDPNF564
  • Award Amount: $4,329,750.00
  • Award Date: March 17, 2026
  • Award Number: 36C77626C0028
  • Solicitation Number: 36C77626B0001
  • Set-Aside: Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)

Awarded Contractor Details

V LINE SERVICES L.L.C. is located at 126 P RICKMAN INDUSTRIAL DR, CANTON, GA 30115.

Contracting Office

The award was made by the Department of Veterans Affairs, Program Contracting Activity Central (PCAC), located at 6100 Oak Tree Blvd, Suite 490, Independence OH 44131. The primary point of contact for this award is Danielle Negron, Contract Specialist, who can be reached at danielle.negron@va.gov.

People

Points of Contact

Danielle NegronContract SpecialistPRIMARY

Files

Files

Download

Versions

Version 1Viewing
Award Notice
Posted: Mar 19, 2026
Z2DA--519-23-908 EHRM Tier 2 Data Center Construction - Big Spring | GovScope