Z2DA--618-26-600, Pharmacy Flooring Repair

SOL #: 36C26326B0003Solicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
NETWORK CONTRACT OFFICE 23 (36C263)
Saint Paul, MN, 55101, United States

Place of Performance

Place of performance not available

NAICS

Flooring Contractors (238330)

PSC

Repair Or Alteration Of Hospitals And Infirmaries (Z2DA)

Set Aside

No set aside specified

Timeline

1
Posted
Nov 6, 2025
2
Last Updated
Nov 25, 2025
3
Submission Deadline
Dec 8, 2025, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

In preparation for and working with Minneapolis VAMC, Minneapolis MN VA Project 618-26-600 PHARMACY FLOORING REPAIR:

a. The primary purpose of project 618-26-600 is the removal and replacement of flooring, according to VA design guides and regulations.

b. Provide all labor, materials, tools and equipment, and planning services necessary for construction of the project as defined in this Scope of Work (SOW) document and described with more details in section A3.

c. The contractor shall work with VA and be prepared for several working meetings with the VA to plan the project execution.

d. The contractor will provide planning documents and construction necessary to renovate or repair the inpatient pharmacy flooring located in the building 70 basement, as shown in the drawings. The contractor shall field verify all existing conditions.

e. The contractor must provide planning to ensure the work performed will meet relevant codes and VA design requirements.

f. The contractor shall provide demolition/installation and operating planning and instructions as appropriate.

g. The Contractor shall meet with VA staff to review the work performed and gather VA comments after each meeting.

h. The Contractor shall dispose of and remove all parts, flooring components replaced. VA will not retain any of the demolished or replaced items, and it shall not be abandoned in place.

i. The contractor shall clean up, return affected work areas to proper working conditions.

People

Points of Contact

Benjamin J WoehrleContract SpecialistPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download

Versions

Version 3
Solicitation
Posted: Nov 25, 2025
View
Version 2
Solicitation
Posted: Nov 14, 2025
View
Version 1Viewing
Solicitation
Posted: Nov 6, 2025