Z2DA--EHRM Construction Amarillo-Project 504-700
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Work includes complete construction and activation of a new Electronic Health Record Modernization system. The scope of this project is to replace the campus main computer room, upgrade and replace telecommunications closets, and upgrade campus fiber and data cable. Project Building locations include 1, 4, 7, 6/8, 9, 10, 11, 12, 13, 14, 26, 28, 29, 33, 34, 35, 36, 44, 45, 46, 48, 49, 53, 54 and the site.
The project includes, but is not limited to, the following infrastructure improvements: Electrical (electrical panel upgrade, power (normal, emergency)), Bonding, UPS, Building Management System interfaces, assess for new and upgrades to existing HVAC, reconfiguration, expansion and renovation of existing space (demo, new construction, finishes), communication infrastructure (new Data outlets, patch panels, upgrade to Cat 6A cable) in buildings as necessary, construct exterior shell space to existing buildings for new telecommunication rooms (site work, demolition, shell space, finishes, plumbing, lighting), physical security upgrades, construct diversified path for WAN, assess and upgrade fiber infrastructure backbone campus wide within buildings and between buildings, hazardous material abatement.
The period of performance shall be 548 calendar days from issuance of the Notice to Proceed.