Z2DA--Install DDPO per CSR 676-26-702 Tomah
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
This Special Notice (Amendment 0004) from the Department of Veterans Affairs provides updated documentation and clarifications for the Z2DA--Install DDPO per CSR 676-26-702 project at the VA Tomah Medical Center in Tomah, WI. This opportunity is a Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside with an estimated magnitude between $250,000 and $500,000. Responses are due by April 30, 2026.
Scope of Work
The project involves the installation of DDPO (Distributed Data Processing Operations) per CSR 676-26-702. This includes detailed electrical and communications installations, specifically structured cabling, grounding, raceways, and associated infrastructure. The work requires adherence to comprehensive technical specifications for materials, installation methods, safety protocols, and quality assurance.
Key Clarifications & Requirements (from Amendment 0004 and Tech Questions Tracker)
- Set-Aside: This is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside. The prime contractor must be certified as an SDVOSB.
- Contract Type: The contract will be Firm Fixed Price (FFP). Economic Price Adjustment for labor and material is not included; offerors must factor any escalation into their FFP.
- Estimated Value: The project's estimated magnitude is between $250,000 and $500,000.
- Material Storage: Progress payments for materials stored on-site or off-site are at the Contracting Officer's discretion.
- Design Team: Members of the design team are not permitted to be part of the construction team.
- Sales Tax: Offerors are responsible for including all state and local sales or use taxes in their bid price.
- Badging: Badging and PIV requirements are not needed for this project, which has a duration of 95 calendar days.
- Drawings: The List of Drawing Sheets in Spec 00 01 15 has been updated.
- Technical Details: Specific requirements include fully equipped telecommunications rooms in Buildings 402 & 407, OS2 LC single mode fiber terminations (no fiber pulls), full cable removal (no abandonment in place), and the use of HEPA carts for cable pulls in high patient risk areas (Bldgs 400, 402, 403, 406, 407).
- Government-Furnished Equipment (GFE): No GFE applies to the General Contractor for this project.
- Off-Hours Work: Allowed with advance written notification (preferably 2 weeks).
Contract & Timeline
- Contract Opportunity Type: Special Notice (Amendment 0004)
- Product Service Code: Z2DA (Repair Or Alteration Of Hospitals And Infirmaries)
- Set-Aside: Service-Disabled Veteran-Owned Small Business (SDVOSB)
- Response Due: April 30, 2026, at 5:00 PM ET
- Published: April 21, 2026
Additional Notes
This amendment provides a "Tech Questions Tracker" with significant clarifications and an updated "676-26-702 Combined Spec Rev 2" document. Bidders must review these documents thoroughly to ensure their proposals align with the clarified scope, technical requirements, and contractual terms. All other terms and conditions of the original solicitation remain unchanged.