Z2DA--NRM| 646-20-109 UD Chiller Capacity and Controls Upgrade (VA-26-00044970) (VA-26-00044970)
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of Veterans Affairs (VA), Network Contract Office 4, has issued a Solicitation for the UD Chiller Capacity and Controls Upgrade Project at the Pittsburgh VA Medical Center - University Drive, Pittsburgh, PA. This Firm-Fixed-Price contract, estimated to be over $15,000,000, requires comprehensive construction services including demolition, general construction, mechanical, and electrical work. Proposals are due June 12, 2026, at 3:30 PM EST.
Scope of Work
The project involves a significant upgrade to the chiller plant, encompassing:
- Demolition of existing systems and general construction.
- Alterations, mechanical, and electrical work for chiller capacity and controls.
- Installation of new chillers and cooling towers, with specific requirements for Trane Centrifugal Chillers and Baltimore Aircoil Company cooling towers due to compatibility with existing infrastructure, as justified by J&A documents.
- Compliance with detailed specifications (Volumes I & II) and extensive drawing sets (General Phasing, Structural, Architectural, Plumbing, Mechanical, Electrical).
- Adherence to prevailing wage rates (Wage Determination PA20260001) and VA safety/infection control programs.
Contract Details
- Contract Type: Firm-Fixed-Price
- Magnitude: Over $15,000,000
- Period of Performance: 540 calendar days from Notice to Proceed (NTP)
- Liquidated Damages: $606.00 per day
- Set-Aside: Full and Open Competition. Bidders must address specific requirements for Service-Disabled Veteran-Owned Small Business (SDVOSB) and Veteran-Owned Small Business (VOSB) participation, including subcontracting plan minimums.
- Bonds: An Offer Guarantee (SF 24) of at least 20% of the offer price (not exceeding $3,000,000) is required. Performance Bond (SF 25) and Payment Bond (SF 25A) will be necessary upon award.
Submission & Evaluation
- Proposals Due: June 12, 2026, 3:30 PM EST.
- Requests for Information (RFIs) Due: May 12, 2026, 3:30 PM EST.
- Submission Format: Electronic submission of two separate PDF files: Volume I (Technical) and Volume II (Price).
- Evaluation: Best Value Tradeoff process. Technical Ability (Experience, Capability, Quality Control) and Past Performance are significantly more important than Price. Bidders must submit detailed statements of prior experience (Exhibit A) and ensure references are prepared for past performance questionnaires (Exhibits C & D). Subcontractor information (Exhibit B) is also critical.
Key Clarifications
Recent RFI responses have clarified critical aspects such as piping material (schedule 20 SS for condenser water), electrical gear specifications (Square D MasterClad, Eaton Cutler-Hammer), accessibility requirements, shutdown coordination, welding standards, lead paint compliance, commissioning document organization, and long lead item considerations.