Z2NZ--631-19-002 Upgrade Steam Distribution System Phase II

SOL #: 36C24126Q0173SolicitationSolicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
241-NETWORK CONTRACT OFFICE 01 (36C241)
TOGUS, ME, 04330, United States

Place of Performance

Leeds, MA

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Other Utilities (Z2NZ)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)

Timeline

1
Posted
Feb 23, 2026
2
Submission Deadline
Mar 31, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Veterans Affairs (VA) is soliciting proposals for the Upgrade Steam Distribution System Phase II project at the VA Central Western Massachusetts Healthcare System Edward P Boland Campus in Leeds, MA. This is a construction project to upgrade the existing steam distribution system. This opportunity is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside and is issued under the VISN 1 Construction MATOC, open only to eligible vendors. Proposals are due March 31, 2026, at 1:00 PM ET.

Scope of Work

The project, identified as Project Number 631-19-002, involves the comprehensive upgrade of the steam distribution system within Buildings 1, 4, 5, 8, 9, 15, and 16. Key aspects include:

  • Removal and upgrade of existing steam distribution systems.
  • Power distribution to new system components.
  • Integration with the existing campus Building Management System (BMS).
  • Removal of hazardous materials, specifically asbestos and lead paint.
  • Adherence to detailed technical specifications covering demolition, concrete, wood, thermal and moisture protection, finishes, plumbing, HVAC, electrical, and communications.

Contract Details & Requirements

  • Contract Type: Task Order under VISN 1 Construction MATOC.
  • Estimated Value: Between $10,000,000 and $20,000,000.
  • Period of Performance: 730 calendar days from Notice to Proceed (NTP). Mobilization must occur within 120 calendar days of NTP.
  • Place of Performance: VAMC Central Western Massachusetts, 421 North Main Street, Leeds, MA 01053.
  • Set-Aside: 100% Service-Disabled Veteran-Owned Small Business (SDVOSB).
  • NAICS Code: 236220 (Commercial and Institutional Building Construction).
  • Bonds: Performance and Payment Bonds required for awards exceeding $150,000; Bid Bonds/Bid Guarantee also required.
  • Subcontracting: Compliance with limitations on subcontracting (85% for general construction).
  • Wage Determination: Adherence to General Decision Number MA20260003 (dated 01/02/2026) for prevailing wage rates and fringe benefits.

Performance Standards & Special Requirements

  • Quality Control: Implementation of a Construction Quality Control (CQC) Plan, requiring USACE Construction Quality Management (CQM) course completion for CQC System Manager.
  • Safety: Strict compliance with OSHA, EM 385-1-1, and VA security programs, including requirements for a Site Safety and Health Officer (SSHO) and Competent Persons (CPs).
  • Coordination: Requirement for a full-time MEPF Coordinator to manage architectural and structural clashes.
  • Commissioning: Comprehensive commissioning of HVAC systems.
  • Environmental Controls: Plans for dust control, infection control (ICRA), noise/vibration control, and construction waste management.
  • Personnel Qualifications: Detailed experience and certification requirements for key personnel (Project Manager, Superintendent, CQC System Manager, MEPF Coordinator, SSHO).
  • Security: Adherence to VA security management, PIV badging, key control, and motor vehicle restrictions.

Submission & Evaluation

  • Proposal Due Date: March 31, 2026, at 1:00 PM ET.
  • Evaluation Factor: Price Only.
  • Submission Method: Electronically through the Vendor Portal. Hard copy proposals or facsimiles will not be accepted.
  • Offer Acceptance Period: Offers must be valid for at least 120 calendar days.
  • Required Components: Signed offer, itemized cost breakdown (using the provided template), signed acknowledgment of amendments, and signed VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING.
  • Site Visit: March 3, 2026, at 11:00 AM ET.
  • RFI Due Date: March 17, 2026, at 1:00 PM ET.
  • Documentation: Specifications, Final Drawings, Wage Determination, and Base Offer Breakdown are provided electronically.

People

Points of Contact

Brian KellyContracting OfficerPRIMARY
NCO1 Construction Team 2SECONDARY

Files

Files

Download
Download
Download
Download
Download

Versions

Version 1Viewing
Solicitation
Posted: Feb 23, 2026
Z2NZ--631-19-002 Upgrade Steam Distribution System Phase II | GovScope