ZMP Multiple Projects
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Federal Aviation Administration (FAA), Enroute Construction Branch, is soliciting proposals for multiple construction projects at the Minneapolis Air Route Traffic Control Center (ZMP) in Farmington, MN. This Firm Fixed-Price, one job lump sum contract covers the replacement of heating boilers exhaust stack, chilled water valves, AHU-12 and AHU-13 humidifiers, and 10 gas unit heaters. The estimated price range for this requirement is $400,000 - $500,000. Proposals are due by February 17, 2026, at 5:00 PM Eastern Time.
Scope of Work
This solicitation encompasses four distinct construction efforts:
- Replace Corroded Heating Boilers Exhaust Stack: Involves replacing two 30-inch OD refractory-lined boiler stacks with new 20-inch ID double-walled stainless steel vent stacks, including breechings, inspection doors, supports, and reconnection of grounding/lightning protection.
- Replace Chilled Water Valves: Includes replacing two Chilled Water Flow Control Valves (FCV) and one Condenser Water FCV for Chillers 100 and 200, along with the Flow Control Bypass Valve for the cooling tower.
- Replace Humidifiers AHU-12 and AHU-13: Focuses on replacing steam humidifiers for Air Handling Units 12 and 13, including associated piping and controls.
- Replace 10 Gas Unit Heaters: Entails the demolition of existing units and installation of 10 new gas-fired unit heaters in the Power Service Building, complete with new thermostats, disconnects, gas piping, and flue piping.
Contract Details
- Contract Type: Firm Fixed-Price, one job lump sum.
- Period of Performance: 120 calendar days after notice to proceed.
- Estimated Price Range: $400,000 - $500,000.
- Set-Aside: None (Full and Open Competition).
- NAICS Code: 236220 (Plumbing, Heating, and Air-Conditioner Contractors).
- Small Business Size Standard: $19.0 million.
- Place of Performance: Minneapolis Air Route Traffic Control Center (ARTCC), Farmington, MN.
Key Requirements
All work must adhere to FAA Specifications, Drawings, and the latest Wage Determinations (MN202600053 dated January 2, 2026). The ARTCC is a 24/7 operating facility, requiring careful scheduling and coordination with the FAA Contracting Officer's Representative (COR) to minimize disruption. Contractors must provide a one-year product workmanship warranty, obtain all required permits, and comply with OSHA, local codes, and the Buy American Act. Bonding and insurance are required. A site visit was held on January 20, 2026.
Submission & Evaluation
Proposals must be submitted electronically in PDF format. Required submissions include a price proposal and a Schedule of Values (SOV) detailing labor, material, G&A Overhead, and Profit percentage. Offers must remain valid for 60 calendar days. Evaluation will be based on Financial Capability, Insurability, and Client Past Performance. Offerors are cautioned to read the Request for Offer (RFO) carefully and ensure all proposals conform to the requirements of Sections L and M.
Important Notes
All amendments will be posted on SAM.gov; contractors are responsible for checking periodically. All contractors must be registered in the System for Award Management (SAM) to be eligible for award. Faxed offers will not be accepted. For questions, contact Joshua Espinosa at joshua.j.espinosa@faa.gov or 404-305-5799.