127EAW26R0001 - Brush Creek Work Center Construction
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The USDA Forest Service is soliciting proposals for the Brush Creek Work Center Construction project (Solicitation #127EAW26R0001) in Berry Creek, CA. This project involves the decommissioning of existing facilities and the construction of a new work center, including utility infrastructure, with an estimated magnitude of more than $10,000,000. This is a Total Small Business Set-Aside. Proposals are due April 2, 2026, at 1:00 PM Pacific Time.
Scope of Work
The project requires the contractor to decommission specified existing Plumas National Forest facilities and construct a complete new work center. This includes an engine garage, barracks, warehouse, storage containers, seedling cooler & canopy, hazmat storage, pump house, trash enclosure, site utilities (water, sewer, electrical), site improvements, and landscaping. The scope also includes several option items for removal tasks. All work must strictly adhere to specifications, drawings, industry standards, a Fire Plan, Spill Plan, Equipment Cleaning protocols, and State law during fire season. The contractor is responsible for providing all labor, tools, materials, and equipment, as well as site security, trash removal, and debris disposal. Work activities are permitted year-round.
Contract Details
This is a Firm-Fixed-Price solicitation with a Total Small Business Set-Aside. The period of performance is 650 calendar days after the Notice to Proceed. The project is located at 12815 Oro Quincy Highway, Berry Creek, CA 95916. A bid guarantee of 20% of the bid price or $1,000,000 (whichever is less) is required for individual project amounts greater than $150,000. Liquidated damages for delay are set at $1,137.77 per calendar day.
Eligibility & Set-Aside
This opportunity is a Total Small Business Set-Aside. Offerors must possess a California General Contractors License Type B or an equivalent license from another state.
Submission Requirements
Proposals must be submitted via email to Gregory.Cunningham@usda.gov. Submissions require five separate attachments: a completed SF1442, a Price Proposal (using the REVISION 001 Schedule of Items), a Project Schedule of Values, a Technical Proposal, and a Bid Guarantee. Bidders must provide pricing for all base and option items, noting that quantities are estimated and require field verification. Past performance recency requirements have been extended to five years. Page limitations apply to specific factors (Factor 2 = 10 pages, Factor 4 = 3 pages).
Evaluation Criteria
Award will be made to the responsible offeror whose proposal is determined to be the best value, considering technical benefit to price relationship. Evaluation factors include Past Performance, Work Plan/Technical Approach, Key Personnel (Project Manager, Superintendent, Quality Control Manager, Project Safety Manager, After-Hours Emergency Contact, Signature Authority), Performance Schedule, and Price.
Key Dates
- Site Visit: A site visit was held on February 25, 2026 (not mandatory, but highly encouraged).
- Requests for Information (RFIs) Due: March 6, 2026, at 1:00 PM PST.
- Proposal Due Date: April 2, 2026, at 1:00 PM Pacific Time.
- Published Date (Latest Amendment): March 11, 2026.
Important Notes
The Davis-Bacon Act wage determination (CA20260007) applies to this project. A Pre-Demolition Asbestos Survey & Lead-Based Paint Inspection Report (May 2024) and other environmental reports are available. The RFI log clarifies that bid options are "adds" and that the specified "Notifier" fire alarm system can be substituted with other manufacturers meeting specifications.