1355-01-436-4620 CWFP CABLE ASSY, ADCAP F/MK48 MODS 6 AND 7 TORPEDOES
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, specifically NAVSUP WEAPON SYSTEMS SUPPORT MECH, is soliciting proposals for the procurement of 1355-01-436-4620 CWFP CABLE ASSY, ADCAP F/MK48 MODS 6 AND 7 TORPEDOES (also referred to as MK62 Mod 1 A Cable). This is a Solicitation for a firm-fixed-price contract. The latest amendment extends the proposal submission deadline to July 14, 2026, at 6:00 PM ET.
Scope of Work
This opportunity involves the procurement of cable assemblies for MK 48 Torpedoes. Key deliverables include:
- Standard cable assemblies (Item 0001)
- First Article (Preproduction) Test Samples (Item 0001AB)
- Production Lot (Periodic) Test Samples (Item 0001AC)
- An option line item (0002) for FY28 requirements.
Detailed specifications and drawings, including DWG 6894510 Rev H, are referenced. Packaging, preservation, transportation, inspection, and acceptance requirements are outlined in the solicitation. The contract includes Performance-Based Payment clauses (FAR 52.232-32).
Significant clarifications have been provided regarding First Article Testing (FAT):
- QTY 2 cable assemblies (6894510) are required for FAT, with delivery to the testing facility within 360 days of contract award.
- Prior to FAT, QTY 5 cable segments must be fabricated for tooling and fabrication practice certification; these are for vendor inspection only and not delivered to the Government.
- All testing costs are Not Separately Priced (NSP) and must be included in the deliverable unit price for the FAT-required price.
Contract & Timeline
- Contract Type: Firm-Fixed-Price (intended)
- Set-Aside: None specified
- Response Due: July 14, 2026, 6:00 PM ET
- Published Date: May 26, 2026
Evaluation Factors
Proposals will be evaluated based on:
- Past Performance (Quality, Timeliness of Delivery, Small Business Utilization) - significantly more important than Small Business Participation.
- Small Business Participation
- Price - all factors other than price are significantly more important than price. Offerors must achieve at least a "limited confidence" rating in past performance to be eligible for award. The government may award without discussions.
Submission & Contact
Proposals must be submitted electronically via email to McKenzy Harris at mckenzy.s.harris.civ@us.navy.mil. A Contract Data Requirements List (CDRL) DD Form 1423 is attached, detailing required data items such as Test Procedures, Test/Inspection Reports, Failure Analysis/Corrective Action Reports, and Contractor's Progress Reports.