2 Hour Lab UPS

SOL #: FA8126Q0018Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8126 AFSC PZIMB
TINKER AFB, OK, 73145-3305, United States

Place of Performance

S Coffeyville, OK

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Converters, Electrical, Nonrotating (6130)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)

Timeline

1
Posted
Jan 29, 2026
2
Last Updated
Feb 19, 2026
3
Submission Deadline
Feb 19, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting proposals for four (4) 480VAC Uninterruptible Power Supplies (UPS) and associated services for the 76 SWEG in Building 9001 at Tinker Air Force Base, OK. This is a Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside. Quotations are due by February 19, 2026, at 12:00 PM CST.

Scope of Work

This combined synopsis/solicitation requires the acquisition, transportation, delivery, installation, and startup of four (4) 480VAC 3-phase 4-wire input UPS units with 480VAC 4-wire output. Specific CLINs detail varying kVA ratings (150 kVA, 120 kVA, 100 kVA) and battery run times. All UPS units must be TAA compliant, use VRLA batteries (Lithium banned), achieve 97% efficiency, respond to brownouts within 1/4th cycle, provide pure sine wave and surge protection, and allow for internal maintenance bypass. An Ethernet connection for power and status monitoring is required. The contractor must also provide training to government personnel on UPS operation and maintenance. Visual documentation (JPGs) provides context of the existing data center/electrical room environment at Tinker AFB.

Contract Details

  • Contract Type: Firm-Fixed-Price
  • Set-Aside: Service-Disabled Veteran-Owned Small Business (SDVOSB)
  • Place of Performance: Building 9001, Tinker Air Force Base, OK
  • Delivery Due: May 5, 2026
  • Installation Period: January 30 - February 28, 2026 (as per SOW)

Submission & Evaluation

Quotations are due by February 19, 2026, at 12:00 PM CST. Vendors must "wet" sign/date and fill in vendor information and pricing on page 2 of the solicitation. Submissions should include proof of technical evaluation criteria and documentation verifying items meet SOW specifications. Emailed quotations are preferred. Award will be based on a Lowest Price Technically Acceptable evaluation, considering technical capability, price, and past performance.

Site Visit & Important Notes

A site visit is scheduled for February 10, 2026, at 0900. Registration for the site visit closes on February 6, 2026, at 1200. Interested parties must provide their First Name, Last Name, Drivers License #, and State of Issue to the POC. A REAL ID is mandatory for base access. The contractor must use licensed electricians in Oklahoma and be an authorized OEM distributor/installer for warranty purposes. Standard OEM warranty requirements apply, including a 24x7 hotline and 24-hour response time.

Contacts:

People

Points of Contact

Anthony DollardSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 6
Combined Synopsis/Solicitation
Posted: Feb 19, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Feb 17, 2026
View
Version 4Viewing
Combined Synopsis/Solicitation
Posted: Feb 17, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Feb 3, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Jan 29, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Jan 29, 2026
View