20--SEAL ASSEMBLY

SOL #: N0010426QYA4TSolicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVSUP WEAPON SYSTEMS SUPPORT MECH
MECHANICSBURG, PA, 17050-0788, United States

Place of Performance

Place of performance not available

NAICS

Boat Building (336612)

PSC

Marine Hardware And Hull Items (2040)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 22, 2026
2
Last Updated
Mar 13, 2026
3
Submission Deadline
Mar 27, 2026, 8:30 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy / NAVSUP Weapon Systems Support Mech is soliciting quotations for an EAF spares requirement of 42 SEAL ASSEMBLY units (NSN 1HM 2040 010515069 SQ). This requirement is for the manufacture and quality assurance of AN/BRA-24 Antenna Seal Assemblies for Navy submarines. This is a Total Small Business Set-Aside. The Government will award to the responsible offeror providing the best value, considering both price and non-price factors. Quotations are due by March 27, 2026.

Scope of Work

This procurement covers the manufacture and contract quality requirements for the AN/BRA-24 Antenna Seal Assembly. Key aspects include:

  • Design and Manufacturing: Adherence to material, physical, mechanical, and test requirements specified on Drawing RE-C49502 and associated specifications. Suppliers must have or fabricate required tooling for acceptance tests.
  • Material Sourcing: Urethane Elastomer (ADIPRENE L167) and Curative (ETHACURE 300) must be procured from LANXESS Urethane Systems.
  • Marking: Permanent marking and identification of each first article and production lot unit per MIL-STD-130.
  • First Article Testing/Inspection: Required, with Government approval from Naval Surface Warfare Center, Philadelphia Division (NSWCPD) prior to commencement.
  • Configuration Control: Adherence to MIL-STD-973 for Engineering Change Proposals, Deviations, and Waivers.
  • Mercury-Free Requirement: All supplied material must be free from metallic mercury contamination, with strict controls and testing protocols.

Contract & Timeline

  • Type: Request for Quotation (RFQ) - Solicitation
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Response Due: March 27, 2026, 8:30 PM EDT
  • Published: March 13, 2026

Evaluation Factors

Award will be based on best value to the Government, considering:

  1. Price
  2. Non-Price Factors (approximately equal to price when combined):
    • Delivery Lead Time: Proposed lead times and schedules will be evaluated, with those in the Government's best interest rated higher.
    • Past Performance: Evaluation of successful performance, quality, timeliness, cost management, communication, proactive management, and customer satisfaction on related contracts.

Quality Assurance & Deliverables

Suppliers must maintain a Quality Inspection System in accordance with MIL-I-45208 or ISO 9001 and NCSL Z540.3 or ISO 10012. Numerous Contract Data Requirements Lists (CDRLs) are required, including:

  • Quality Inspection & Test Plan
  • First Article Testing/Inspection Procedure and Report
  • Production Lot Testing/Inspection Report
  • Certified Mill Certificate, Certified Industrial Lab Analysis, Certificate of Compliance
  • Visual/Dimensional Inspection Report
  • Mercury Exclusion Certification

Packaging must comply with MIL-STD 2073.

Contact Information

For inquiries, contact JESSICA.T.GRZYWNA.CIV@US.NAVY.MIL or call 215-697-5095. Notifications regarding first article testing should be sent to matthew.j.ogilvie.civ@us.mavy.mil.

People

Points of Contact

JESSICA.T.GRZYWNA.CIV@US.NAVY.MILPRIMARY

Files

Files

View
Download
View
View

Versions

Version 4Viewing
Solicitation
Posted: Mar 13, 2026
Version 3
Solicitation
Posted: Feb 24, 2026
View
Version 2
Solicitation
Posted: Feb 6, 2026
View
Version 1
Pre-Solicitation
Posted: Jan 22, 2026
View
20--SEAL ASSEMBLY | GovScope