43--PUMPING UNIT,HYDRAU, IN REPAIR/MODIFICATION OF
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVSUP Weapon Systems Support Mech, is soliciting proposals for the repair and modification of Pumping Unit, Hydrau (PSC 4320). This is a Firm Fixed-Price (FFP) contract requiring specialized repair services. The response deadline is June 30, 2026.
Scope of Work
This solicitation is for the repair of Pumping Unit, Hydrau, requiring adherence to MIL-STD Packaging, Government Source Inspection, FOB Source, and Commercial Asset Visibility (CAV) Reporting. Contractors must be an authorized repair source and perform work according to their standard practices, manuals, and approved technical procedures. The resultant award will be issued bilaterally, requiring contractor acceptance.
Contract & Timeline
- Type: Firm Fixed-Price (FFP) contract.
- Set-Aside: None specified (unrestricted).
- Response Due: June 30, 2026, 09:00 PM UTC.
- Published: April 30, 2026.
- Repair Turnaround Time (RTAT): 206 days after receipt of asset. Price reductions will apply for inexcusable delays.
- Induction Expiration Date: 365 days after contract award.
- Option for Increased Quantity: The Government intends to include an option for up to 100% (10 EA) additional units for a period of 179 days, exercisable within 365 days of contract award.
Key Requirements
- Quotes must be for REPAIR only; test and evaluation (T&E) only quotes will not be accepted.
- Adherence to IUID requirements (DFARS 252.211-7003) and MIL-STD-130, REV N for marking.
- Contractor is responsible for all inspection requirements, compliance, and record-keeping (365 days post-delivery).
- Packaging must comply with MIL-STD 2073.
- Only authorized distributors of the original manufacturer's item will be considered; proof of authorization is required with the offer.
Submission Instructions
Electronic submission of quotes, representations, and certifications must be sent via email to RACHAEL.L.COSTANOZ.CIV@US.NAVY.MIL. Quotes must include repair unit price, total price, RTAT, new unit price, T&E fee (if applicable), CAGE codes, cost breakdown (if feasible), and a quote expiration date (minimum 90 days). The latest amendment incorporates FAR clause 52.222-90, "Addressing DEI Discrimination by Federal Contractors (DEV 2026-00038) (APR 2026)".