56--NV-STILLWATER NWRC-HUNTER RD GRAVEL PROJ

SOL #: 140F0S26Q0004Solicitation

Overview

Buyer

Interior
Us Fish And Wildlife Service
FWS, OVER SAT G/S
Falls Church, VA, 22041, United States

Place of Performance

Place of performance not available

NAICS

Other Crushed and Broken Stone Mining and Quarrying (212319)

PSC

Mineral Construction Materials, Bulk (5610)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Dec 16, 2025
2
Last Updated
Mar 3, 2026
3
Submission Deadline
Feb 25, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Fish and Wildlife Service (FWS) is soliciting proposals for the Stillwater Hunter Road Gravel Project to procure and deliver Type 2 Class B base course aggregate for resurfacing 6.25 miles of Hunter Road at the Stillwater National Wildlife Refuge (NWR) Complex in Fallon, NV. This is a Total Small Business Set-Aside. The government has allocated $560,042.96 for this project, and vendors must quote the quantity of stone they can provide for this amount. Quotes are due by February 25, 2026.

Scope of Work

The requirement involves the delivery of Type 2 Class B base course aggregate, initially estimated at approximately 16,000 tons, to Hunter Road. The aggregate will be used to create a maximum 24-foot-wide roadway with a 6-inch gravel surface. The contractor is responsible for furnishing all supervision, labor, materials, and equipment for delivery, with aggregate dumped directly onto the roadway. Refuge staff will perform the final road shaping and grading. All aggregate must conform to specific technical specifications, including Type 2 Class B base course requirements (crushed stone with angular shapes, plasticity index of 6 or less, and other detailed material properties). Deliveries are scheduled Tuesday through Friday, 07:00 to 15:00, with a minimum daily delivery of 580 cubic yards. Flexibility in truck spacing and consecutive dumping is permitted if coordinated safely with on-site staff.

Contract Details

This is a Firm Fixed Price Commercial Products Contract. The period of performance commences upon award, with work to be completed within 90 days. The earliest performance start date is March 1, 2026, and all work must be completed by June 30, 2026. This acquisition is a Total Small Business Set-Aside.

Submission & Evaluation

Offerors must submit quotes specifying the quantity of stone that can be provided and delivered for the government's allocated budget of $560,042.96, including an all-in price (material, delivery, fuel, placement, and all associated fees). Submissions should include a statement confirming understanding of the Type 2 Class B base course standard and the vendor's CAGE code. Quotes must be submitted in two parts: (1) non-price (technical acceptability, including past performance) and (2) price. Electronic quotations should be emailed to Robert_Sung@fws.gov. Each delivery must be accompanied by a bill of lading, verified and signed by the on-site Project Manager. Billing can be done as service is rendered, preferably weekly. Evaluation will be based on Technical Acceptability and Price, with award made to the responsible offeror with the lowest evaluated price that meets or exceeds acceptable technical standards. Tradeoffs are not permitted.

Key Dates & Contact

  • Quotes Due: February 25, 2026, 18:00:00Z
  • Questions Due: 3 days prior to closing (10 AM PT)
  • Contact: Robert Sung (robert_sung@fws.gov, 5038722825)

People

Points of Contact

Sung, RobertPRIMARY

Files

Files

Download
Download
Download
Download

Versions

Version 5
Award Notice
Posted: Mar 3, 2026
View
Version 4Viewing
Solicitation
Posted: Feb 23, 2026
Version 3
Solicitation
Posted: Feb 17, 2026
View
Version 2
Solicitation
Posted: Feb 13, 2026
View
Version 1
Sources Sought
Posted: Dec 16, 2025
View
56--NV-STILLWATER NWRC-HUNTER RD GRAVEL PROJ | GovScope