59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, specifically NAVSUP WEAPON SYSTEMS SUPPORT MECH, is soliciting proposals for the repair and modification of Circuit Card Assemblies (PSC 5998). This opportunity is a Total Small Business Set-Aside and requires a specific Repair Turnaround Time (RTAT) and Government Source Inspection (GSI). The quantity for this requirement has been increased from 60 to 61 units. Offers are due by March 2, 2026.
Scope of Work
This Request for Quote (RFQ) is for the repair and modification of CIRCUIT CARD ASSEMB, identified by CAGE 072E5, Ref. No. 1715296-101. Key requirements include:
- Adherence to a required Repair Turnaround Time (RTAT) of 67 days.
- Performance of all repair work in accordance with the contractor's standard practices, manuals, and directives, including MIL-STD-130 for marking.
- Contractor responsibility for all inspection requirements, with Government Source Inspection (GSI) also required.
- Packaging in accordance with MIL-STD 2073.
- Freight is FOB Origin and will be handled by the Navy as per the Commercial Asset Visibility (CAV) Statement of Work.
Contract & Timeline
- Type: Solicitation (Resultant award will be bilateral)
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- Offer Due Date: March 2, 2026
- Published Date: February 18, 2026
Submission Requirements
Offerors must provide:
- Quote Amount (Unit Price, Total Price).
- Proposed Repair Turnaround Time (RTAT) in days. If the 67-day requirement cannot be met, capacity constraints must be provided.
- Teardown & Evaluation fee/price if an asset is determined Beyond Repair (BR/BER).
- Awardee CAGE, Inspection & Acceptance CAGE, and Facility/Subcontractor CAGE.
- New unit price and delivery lead-time for comparison.
- Verification of nomenclature, part number, and NSN prior to responding.
Additional Notes
The solicitation includes detailed instructions for obtaining applicable documents (e.g., MIL-STD-130) from various sources like DODSSP. Information regarding changes in design, material servicing, or part numbers must follow specific coding (Code 1-6) and require Contracting Officer approval. All repair awards will be pre-populated with SUBCLIN remarks for RTAT, Throughput Constraint, and Induction Expiration Date. Any questions should be directed to the Point of Contact.