61--CABLE ASSEMBLY,SPEC

SOL #: N0010426QNA17Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVSUP WEAPON SYSTEMS SUPPORT MECH
MECHANICSBURG, PA, 17050-0788, United States

Place of Performance

Place of performance not available

NAICS

Power (335311)

PSC

Miscellaneous Electric Power And Distribution Equipment (6150)

Set Aside

No set aside specified

Timeline

1
Posted
Nov 26, 2025
2
Last Updated
Jun 9, 2026
3
Submission Deadline
Jul 8, 2026, 8:30 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, NAVSUP Weapon Systems Support Mechanicsburg, has issued a solicitation for the manufacture and supply of CABLE ASSEMBLY,SPEC. This opportunity is designated as a Total Small Business Set-Aside and is pursuant to Emergency Acquisition Flexibilities (EAF). The award will be based on the lowest aggregate total price. Proposals are due by July 8, 2026, at 8:30 PM UTC.

Scope of Work

This requirement involves the manufacture and delivery of specific cable assemblies, adhering to detailed design, performance, and quality assurance standards. The resultant award will be issued bilaterally and is DO certified for national defense under the Defense Priorities and Allocations System (DPAS). An option for increased quantity is included, allowing the Government to add additional quantities up to 365 days after the award.

Contract & Timeline

  • Type: Solicitation (Bilateral Award)
  • Set-Aside: Total Small Business
  • Product Service Code: 6150 (Miscellaneous Electric Power And Distribution Equipment)
  • Evaluation: Lowest aggregate total price, inclusive of the option provision.
  • Delivery: CLIN 0001AA and 0001AB require delivery within 509 days.
  • Response Due: July 8, 2026, 8:30 PM UTC
  • Published: June 9, 2026

Key Technical Requirements

Contractors must adhere to specific design, manufacture, and performance requirements outlined in drawing 5893729. Marking must comply with MIL-STD-129 and MIL-STD-130. Configuration control is governed by MIL-STD-973. The materials supplied must be mercury-free, and a Government Security Clearance is required. Production Lot Approval (Contractor Testing) is mandatory, and serialization of each cable assembly is required, with serial numbers obtained from NUWC Newport.

Quality Assurance & Special Conditions

The quality system must be acceptable to the Government, in accordance with ISO 9001, though MIL-I-45208 is also permitted. The contractor is responsible for all inspection requirements and maintaining records. A one-year warranty from the date of delivery is required. Notably, OTSI (CAGE: 0F1X1) is waived from all CDRL requirements, including Production Lot Testing (PLT) and First Article Testing (FAT). Access to drawings needs to be requested on SAM.gov, followed by an email to the Point of Contact.

Additional Notes

A post-award conference is recommended to review key features, with NUWC Newport's engineering support activity interested in participating. Contact: Zachary R. Morrill at zachary.r.morrill.civ@us.navy.mil.

People

Points of Contact

ZACHARY.R.MORRILL.CIV@US.NAVY.MILPRIMARY

Files

Files

View
View
View
Download
View
Download
View
View
View

Versions

Version 11Viewing
Solicitation
Posted: Jun 9, 2026
Version 10
Solicitation
Posted: May 7, 2026
View
Version 9
Solicitation
Posted: May 5, 2026
View
Version 8
Pre-Solicitation
Posted: May 5, 2026
View
Version 7
Solicitation
Posted: Apr 16, 2026
View
Version 6
Solicitation
Posted: Feb 19, 2026
View
Version 5
Pre-Solicitation
Posted: Feb 19, 2026
View
Version 4
Solicitation
Posted: Feb 12, 2026
View
Version 3
Solicitation
Posted: Feb 5, 2026
View
Version 2
Solicitation
Posted: Nov 28, 2025
View
Version 1
Pre-Solicitation
Posted: Nov 26, 2025
View
61--CABLE ASSEMBLY,SPEC | GovScope