631-26-010 Abate and Upgrade Building 1 Common Area

SOL #: 36C24126Q0357Solicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
241-NETWORK CONTRACT OFFICE 01 (36C241)
TOGUS, ME, 04330, United States

Place of Performance

Leeds, MA

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Maintenance Of Hospitals And Infirmaries (Z1DA)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)

Timeline

1
Posted
Apr 16, 2026
2
Last Updated
May 28, 2026
3
Submission Deadline
Jun 5, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Veterans Affairs (VA), specifically the 241-Network Contract Office 01 (36C241), is soliciting proposals for the Abatement and Upgrade of Building 1 Common Areas at the Edward P. Boland Medical Center Campus in Leeds, MA. This project involves extensive demolition, hazardous material abatement, and renovation work. The estimated magnitude of construction is between $2,000,000 and $5,000,000. This is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside for eligible VISN 1 Construction MATOC vendors. Proposals are due June 5, 2026, at 1:00 PM EDT.

Scope of Work

The project encompasses the demolition and removal of existing structures, abatement of hazardous materials (including ACM and potential lead in wall coverings/carpet), and comprehensive upgrades to common areas within Building 1. Key tasks include:

  • Demolition of ACM flooring, wall coverings, and storefront assemblies.
  • Resurfacing and painting of walls, installation of new flooring (LVT, carpet tile, terrazzo), base, and accessories (wall protection, handrails, corner guards).
  • Construction of partition walls.
  • Amendment 0001 added refinishing work for Building 1 Room 1282, including carpet demolition, floor preparation, LVT installation (Mannington LVT), flooring transitions, and wall preparation/painting.
  • Amendment 0003 clarified responsibilities for removing, storing, and replacing wall-attached items, wall preparation after item removal, removal of integral terrazzo cove base, and repair/painting after removing temporary water fountain covers. Expansion joints are also required. All work must adhere to VHA, OSHA, EPA, DLS, MassDEP, NEC, NFPA, and applicable building codes, with strict infection control measures.

Contract Details & Timeline

  • Contract Type: Task Order under VISN 1 Construction MATOC.
  • Estimated Value: $2,000,000 - $5,000,000.
  • Period of Performance: 90 calendar days for administrative tasks (preconstruction submissions) followed by 540 calendar days after Notice to Proceed.
  • Set-Aside: 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) for eligible VISN 1 Construction MATOC vendors. Subcontracting is limited to 85% for non-SDVOSB/VOSB firms.
  • Place of Performance: Building 1, Edward P. Boland Medical Center Campus, Leeds, MA 01053.

Submission & Evaluation

  • Proposal Due Date: June 5, 2026, at 1:00 PM EDT.
  • Submission Method: Via the Vendor Portal only. Hard copies or faxes will not be accepted.
  • Evaluation Factor: Price Only.
  • Offer Acceptance Period: Offerors must allow 120 calendar days for Government acceptance.
  • Required Documents: Bidders must use the provided Itemized Cost Breakdown spreadsheet. Performance, Payment, and Bid Bonds are required.
  • Amendments: Offerors must acknowledge receipt of all amendments.
  • RFI Deadline: The final deadline for Requests for Information was May 21, 2026, at 1:00 PM EST.

Additional Notes

Contractors are responsible for obtaining all necessary permits (City of Northampton, MA DEP) and complying with Construction Wage Rate Requirements (General Decision MA20260003). Temporary badges are acceptable for on-site personnel, and building materials for VA projects in Massachusetts are exempt from sales tax (VA provides Form ST-5C). Two site visits were held on April 22, 2026, and May 14, 2026.

People

Points of Contact

Brian C KellyPRIMARY
NCO1 Construction Team 2SECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4Viewing
Solicitation
Posted: May 28, 2026
Version 3
Solicitation
Posted: May 6, 2026
View
Version 2
Solicitation
Posted: Apr 24, 2026
View
Version 1
Solicitation
Posted: Apr 16, 2026
View