732 AMS Airfield CCTV Camera Upgrades - Amendment 2

SOL #: FA500026QCMRACombined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA5000 673 CONS LGC
JBER, AK, 99506-2501, United States

Place of Performance

EARECKSON AS, AK

NAICS

Other Communications Equipment Manufacturing (334290)

PSC

Miscellaneous Alarm, Signal, And Security Detection Systems (6350)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 31, 2026
2
Last Updated
Apr 21, 2026
3
Submission Deadline
Apr 22, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force, specifically the 673 CONS LGC, has issued Amendment 2 to a Combined Synopsis/Solicitation (FA500026QCMRA) for Airfield CCTV Camera Upgrades for the 732nd Air Mobility Squadron (AMS) at Joint Base Elmendorf-Richardson (JBER), Alaska. This opportunity requires the upgrade of the current camera system with 22 new commercially available cameras, servers, controls, and monitors for monitoring the flightline, various ramps, and a freight warehouse. The acquisition is a Total Small Business Set-Aside.

Scope of Work

The project involves upgrading the Closed Circuit Flightline Video System in accordance with Salient Characteristics and Building Schematics. This includes the installation of new indoor and outdoor PTZ cameras (e.g., 5.0-8.0 MP resolution, 32x-36x optical zoom, WDR, IR illumination), a FIPS-validated Network Video Recorder (NVR) with at least 64TB storage, and Video Management Software (VMS) with per-channel licensing. Network infrastructure requires a DISA-approved Gigabit PoE+ switch and CAT5E cabling rated for arctic conditions, along with 22 PoE injectors. Installation services must be performed by certified technicians, including physical installation, configuration, testing, removal of old analog equipment, and full system commissioning. A minimum 5-year warranty and 5 years of firmware updates are required. The system must be fully installed and functional by September 1, 2026.

Contract Details

  • Contract Type: Combined Synopsis/Solicitation (RFQ)
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS Code: 334290 (Size Standard: 800 employees)
  • Product Service Code: 6350 (Miscellaneous Alarm, Signal, And Security Detection Systems)
  • Place of Performance: Joint Base Elmendorf-Richardson (JBER), Alaska
  • Period of Performance: Installation and full functionality by September 1, 2026.
  • Delivery: FOB destination to JBER, AK 99506.

Submission & Evaluation

  • RFQ Closing Date: April 22, 2026, at 12:00 PM Alaska Daylight Time.
  • Submission Method: Quotes must be submitted via email to clay.schott@us.af.mil and john.gosh@us.af.mil. No .zip files are accepted.
  • Evaluation Factors: Price (fair and reasonable) and Technical Acceptability (pass/fail based on meeting salient characteristics).
  • Eligibility: Offerors must be registered in the System for Award Management (SAM) at www.sam.gov.
  • Quote Validity: Quotes must be held firm for 60 calendar days from the closing date.

Key Amendments & Clarifications

Amendment 2 updated the CLIN structure, Salient Characteristics, and Pricing Schedule, and added Attachments 5 (Q&A) and 6 (As Builts/terminal COM photos). The Q&A document (Attachment 5) clarified that the RFQ deadline was extended to April 22, 2026. It also specified that Power over Ethernet (PoE) is required, vendors are responsible for removing old analog equipment, existing mounts should be used where possible, and new ethernet cabling is needed. A site visit was conducted on April 7, 2026.

People

Points of Contact

John F. GoshSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download

Versions

Version 4
Combined Synopsis/Solicitation
Posted: Apr 21, 2026
View
Version 3Viewing
Combined Synopsis/Solicitation
Posted: Apr 15, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Apr 13, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Mar 31, 2026
View