ADD Non-Potable Water Distribution Lines to Irrigation Areas, Multi
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Air Force is soliciting bids for Project QUUG 19-1000, ADD Non-Potable Water Distribution Lines to Irrigation Areas, Multi at Morón Air Base, Spain. This project involves expanding the non-potable water distribution system to cover irrigation areas and provide for future building connections. The estimated magnitude is between $500,000 and $1,000,000 USD. Bids are due June 29, 2026, at 12:00 PM Z Time Zone (UTC +0).
Scope of Work
The project's primary objective is to expand and upgrade the non-potable water distribution system at Morón Air Base. Key tasks include:
- Site Investigation: Verification of existing utility locations using Ground Penetrating Radar (GPR).
- Civil Works: Excavation, backfilling, and related civil infrastructure for new lines.
- Mechanical Works: Installation of programmers for existing sprinkler systems, modification of the non-potable water system at the treatment facility, and installation of piping, valves, hose bibbs, water meters, pressure gauges, solenoid valves, and solar-powered programmers.
- Area Expansions: Work is broken down into a base bid and six options (CLINs #1-7) covering expansions to various irrigation areas (e.g., Area #2, #3, #4, #5) and connections for multiple buildings (#106, #110, #119, #192, #203).
- Material Specifications: Use of specific polyethylene pipes (HDPE PN10, PN16), fittings, and components.
- Quality Control: Requirements for concrete quality control, aggregate testing, and material testing.
- Environmental Protection: Compliance with environmental regulations, including plans for conservation, waste management, and hazardous materials, adhering to DoD and Spanish environmental standards.
- Safety: Implementation of a Health and Safety Program.
Contract Details
- Type: Solicitation (Firm Fixed Price, implied from Section B).
- Estimated Value: $500,000 - $1,000,000 USD.
- Period of Performance: 570 calendar days from the date of award.
- Set-Aside: This solicitation is intended ONLY FOR LOCAL SOURCES in accordance with FAR 5.202(a)(12). Local sources are defined as those normally resident, licensed, and registered to conduct construction business in Spain. Offers from non-local sources will not be considered. Companies must meet Spanish legislation requirements for government works and possess Spanish classification certificates.
- NAICS Code: 237110 (Construction Of Water Supply Facilities), Size Standard: $45,000,000.00.
Key Dates & Submission
- Pre-proposal Conference / Site Visit: June 12, 2026, at 1300 hours local time, Contracting Conference room, bldg 106. RSVP via email at least 24 hours prior. Escort requests require 72 hours notice.
- Questions Due: June 19, 2026, at 1200 local time via email.
- Bids Due: June 29, 2026, at 12:00 PM Z Time Zone (UTC +0). Late bids will not be accepted.
- Bid Validity: Bids must remain valid through September 30, 2026.
- Submission: Proposals must be submitted in CD form with .pdf files; a printed copy is recommended.
- Bid Guarantee: The requirement for a bid guarantee has been removed by amendment.
Evaluation
Offers will be evaluated according to the criteria in Section M, without discussions. Nonconforming bids will not be accepted or evaluated.
Contact Information
- TSgt Terrel Cloud: terrel.cloud@us.af.mil
- SrA Tyler Seng: tyler.seng@us.af.mil
- Elia Portz: elia.portz_cueli.1.es@us.af.mil