A/E Design of Freight Elevator #12 at GPO Building A
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
This project is intended for the Replacement and/or Retrofit of one (1) Elevator at the GPO, Washington, DC. The A/E shall be responsible for the performance of the Investigative Services to understand the existing conditions, review of existing as-built drawings, design & bidding documents, specifications, construction cost estimates, construction phasing schedule, bid phase services, construction period services, and preparation of as built & record drawings. The A/E shall also accommodate review of the design by a potential third-party Subject Matter Specialist (SMS), periodic inspections by SMS, final inspections and certifications