Apron Striping - Stratton Air National Guard Base

SOL #: W50S8J26QA015Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W7NR USPFO ACTIVITY NYANG 109
SCOTIA, NY, 12302-9572, United States

Place of Performance

Schenectady, NY

NAICS

Highway (237310)

PSC

Maintenance Of Airport Runways And Taxiways (Z1BD)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
May 19, 2026
2
Last Updated
May 19, 2026
3
Submission Deadline
Jun 9, 2026, 4:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force, specifically the 109th Airlift Wing, Stratton Air National Guard Base (ANGB) in Schenectady, NY, is soliciting quotes for Apron Striping services. This is a Total Small Business Set-Aside opportunity. A site visit is scheduled for May 28, 2026, and quotes are due by June 09, 2026, at 12:00 PM ET.

Scope of Work

This Request for Quote (RFQ) covers the removal of existing pavement markings and the application of new airfield striping on the apron, as well as interior hangar epoxy striping. Key requirements include:

  • Exterior Apron Line Removal & Striping: Grinding approximately 10,560 linear feet of existing lines and applying new exterior airfield paint for towlines, tip clearances, apron edges, candy cane lines, apron boxes, and ECP signs. This includes fabricating and turning over a physical ECP stencil.
  • Interior Hangar Epoxy Striping: Preparation of interior surfaces and application of two-part epoxy for restricted areas and candy cane lines within the hangar.
  • Optional Line Item: Application of reflective media (glass beads) to specific exterior aircraft-associated lines (yellow solid, yellow dashed, and red/white striped lines).

All work must comply with applicable Department of War (DOW), Air Force, and Federal Aviation Administration (FAA) regulations. Exterior paint must meet military or FAA standards, and interior paint must be a two-part epoxy compatible with existing hangar floors.

Contract Details

  • Solicitation Number: W50S8J26QA015
  • Contract Type: Implied Firm Fixed Price for all line items.
  • NAICS Code: 237310 (Maintenance Of Airport Runways And Taxiways) with a size standard of $45,000,000.
  • Set-Aside: 100% Total Small Business Set-Aside (FAR 19.5).
  • Period of Performance: Project to begin 14 days after Notice to Proceed and be completed within 30 days.
  • Place of Performance: Stratton Air National Guard Base, Schenectady, NY.
  • Wage Rates: Construction Wage Rates are based on General Decision Number NY20260002, Modification Number 1, dated 01/30/2026, which applies to federal construction projects in specified New York counties under the Davis-Bacon Act.

Submission & Evaluation

  • Quote Submission: All quotes must be submitted via email to 109.aw.fal.msc.contracting@us.af.mil.
  • Evaluation Factors: Quotes will be evaluated based on Price, Technical, and Past Performance.
  • Technical Evaluation: Requires a brief description of a single completed project demonstrating relevant experience.
  • Past Performance: Based on a verified Point of Contact for the submitted project.
  • The Government reserves the right to evaluate quotes and make an award based on initial submissions.

Key Dates

  • Published Date: May 19, 2026
  • Site Visit: Thursday, May 28, 2026, at 1:00 PM at the Civil Engineering Building, 1 Air National Guard Road, Scotia, NY 12302. Attendees must confirm intent to attend via email and present identification and vehicle documentation.
  • Offer Due Date: June 09, 2026, at 12:00 PM ET.

Additional Notes

Numerous FAR and DFARS clauses are incorporated by reference and in full text. Contractors must adhere to site conditions, work area delineation, operational coordination, and security/access requirements, including background checks and AT Level I / OPSEC training for personnel.

People

Points of Contact

Files

Files

No files attached to this opportunity

Versions

Version 2
Solicitation
Posted: May 19, 2026
View
Version 1Viewing
Solicitation
Posted: May 19, 2026