ATIC Support Industrial Control System Phase 1 Review Edwards AFB

SOL #: FA930226Q0012Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA9302 AFTC PZZ
EDWARDS AFB, CA, 93524-1185, United States

Place of Performance

Edwards, CA

NAICS

Engineering Services (541330)

PSC

Other Professional Services (R499)

Set Aside

No set aside specified

Timeline

1
Posted
Jan 28, 2026
2
Last Updated
Feb 26, 2026
3
Submission Deadline
Feb 25, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting proposals for ATIC Support Industrial Control System (ICS) Phase 1 Review at Edwards Air Force Base, CA. This 100% Small Business Set-Aside opportunity seeks to assess ICS infrastructure, identify gaps, and provide recommendations for cybersecurity compliance and Authority to Operate (ATO). Quotes are due February 25, 2026, at 10:00 AM PT.

Purpose & Scope of Work

This acquisition aims to provide technical support for a phased review of Industrial Control Systems (ICS) infrastructure at two Government facilities and an associated wide-area network. The objective is to assess the current posture, identify gaps, and provide actionable recommendations to support cybersecurity compliance and achieve/maintain ATO. The scope includes:

  • Conducting an initial site visit and infrastructure review at two Government facilities.
  • Performing an ATO readiness assessment.
  • Developing a detailed network map/topology diagram.
  • Inventorying ICS hardware, software, and network devices.
  • Evaluating existing posture against DoD Risk Management Framework (RMF) controls and NIST requirements.

Key Deliverables & Performance

The primary deliverable is a Phase 1 Initial Report, summarizing site observations, high-level findings, and immediate risks for both facilities. This report must be submitted in MS Word/PDF format by Day 30 after contract award. The entire Phase 1 review must begin within 30 calendar days of award and be completed no later than 60 calendar days after award.

Contract Details

  • Contract Type: Firm Fixed Price
  • Product Service Code (PSC): R499 (Other Professional Services)
  • NAICS Code: 541330 (Engineering Services) with a size standard of $25,500,000.00
  • Set-Aside: 100% Small Business
  • Place of Performance: Two Government-designated facilities at Edwards AFB, CA 93524. Analysis and reporting may be conducted at the contractor's site.

Submission & Evaluation

Offerors must prepare quotations in accordance with FAR 52.212-1, including SAM UEI, CAGE Code, Contractor Name, Payment Terms, Point of Contact, Email, Offer Expiration Date, and a Capabilities Statement. A completed copy of FAR 52.212-3, Alt I, or notification of its availability on SAM.gov is also required. Quotes are due on February 25, 2026, at 10:00 AM PT. Evaluation will be based on Best Value, considering the following factors:

  1. Technical Acceptability
  2. Price
  3. Past Performance The combined importance of Technical and Past Performance is equal to Price. The Government intends to award without discussions, so initial quotes should be comprehensive.

Special Requirements

Contractor personnel must hold a favorable Tier 3 background investigation (or equivalent) and be US Citizens. All work must comply with DoD cybersecurity, OPSEC, and physical security requirements. Site access requires 3 days advanced notice. Government Furnished Information (GFI) will include facility floor plans, network documentation, ATO packages, control baselines, and prior assessments.

Contact Information

People

Points of Contact

JAMIL MINOSASECONDARY

Files

Files

Download
Download

Versions

Version 4
Solicitation
Posted: Feb 26, 2026
View
Version 3
Solicitation
Posted: Feb 26, 2026
View
Version 2Viewing
Solicitation
Posted: Feb 20, 2026
Version 1
Solicitation
Posted: Jan 28, 2026
View