B-21 LRS FUELS ADMIN/LAB AND REFUELER TRUCK YARD
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Construct a new Logistics and Readiness Fuels Flight administrative and laboratory facility for the 7th Logistics and Readiness Squadron at Dyess Air Force Base consisting of administrative space, command space, laboratory space, physical control capability and proximity to the refueler truck yard. Construction includes a single-story facility with reinforced concrete drilled pier foundation, load bearing masonry walls, prefinished metal wall panels, standing seam metal roof on light gauge steel framing and interior finishes. The facility also includes laboratory fixtures including grounding rails, sinks, cabinetry, water filtration, vented enclosure, dedicated heating and air conditioning, drainage, base wide fuel system control interface, electrical, secure communications, a backup generator per Air Force Instruction 32-1062, mass notification system, fire suppression and alarm system. Supporting facilities include all utilities, detention pond for storm drainage, site improvements, pavements, communications infrastructure, special foundation due to local expansive soil, site demolition and other supporting work necessary to make a complete and usable facility. Storm drainage includes an area for temporary water retention. The existing fuels administration laboratory facility, B4111, will be demolished by a separate project in the following fiscal year. This project will comply with Unified Facility Criteria 4-010-06, Cybersecurity of Facility-Related Control Systems. Facilities will be designed as permanent construction in accordance with Department of Defense Unified Facilities Criteria 1-200-01, General Building requirements. This project will comply with Department of Defense antiterrorism/ force protection requirements per Unified Facilities Criteria 4-010-01.