B1030 UPS Replacement Edwards AFB
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force has issued a Request for Quote (RFQ) FA930226Q0041 for Uninterruptible Power Supply (UPS) preventative maintenance and component replacement at Edwards Air Force Base, CA. This opportunity is a 100% Small Business Set-Aside under NAICS code 335999. Quotes are due by May 15, 2026, at 5:00 PM PST.
Scope of Work
This solicitation requires contractors to provide and install necessary parts and batteries to restore four critical UPS units to optimal working condition. The scope includes supervision, labor, materials, equipment, and transportation. Key tasks involve:
- UPS #1 (Eaton 93PM, 150kVA): Installation of two Eaton OEM Power Modules (P/N: 744-A4535), twelve Eaton OEM Fans (P/N: P-151000010), three Eaton OEM Fans (P/N: 151101091-001), and eighty new batteries (P/N: UPS12-545PLP). OEM-certified technicians are required for UPS-1 repairs and firmware updates.
- UPS #2 (Toshiba G9000, 225kVA): Installation of forty new batteries (P/N: UPS12-355PLP), utilizing an additional forty government-furnished batteries of the same part number.
- UPS #3 & #4 (Toshiba G9000, 225kVA): Provision and installation of eighty new batteries (P/N: 12-HX-400FR) for each unit. The contractor is also responsible for the removal and proper disposal of all replaced parts and batteries.
Contract Details
- Contract Type: Firm Fixed Price (FFP)
- Set-Aside: 100% Small Business Set-Aside
- NAICS Code: 335999 "All Other Miscellaneous Electrical Equipment and Component Manufacturing" (Size Standard: 600 employees)
- Period of Performance: 30 Days After Receipt of Order (ARO)
- Place of Performance: Edwards Air Force Base, CA 93524-1185
- Authority: Simplified Acquisition Procedures (FAR 12.201-1) are being used. Davis-Bacon prevailing wage requirements do not apply.
Submission & Evaluation
Offerors must submit quotes via email to jamil.minosa.2@us.af.mil and jenna.jacobson@us.af.mil. The maximum file size for emails is 10MB. Quotes must include:
- SAM UEI, TIN Number, CAGE Code, Contractor Name
- Payment Terms (NET 30 or Discount), Point of Contact Name and Phone Number, Email address
- Price, Warranty, Date Offer Expires, FOB Destination, Delivery Lead Time/Period of Performance Terms
- Technical Approach The Government intends to award without discussions. Evaluation will be based on Best Value, considering Technical Acceptability, Price, and Past Performance.
Key Dates
- Site Visit: Tuesday, May 12, 2026, at 9:00 AM. Link requests for visitor information were due by May 5, 2026, 10:00 AM. Visitor information was due by May 6, 2026, 9:00 AM.
- Questions Due: May 13, 2026, at 9:00 AM Pacific Daylight Time.
- Quotes Due: May 15, 2026, at 5:00 PM Pacific Standard Time.
Additional Notes
Base access requires coordination with the mission partner and a 72-hour vetting process. All UPS units are on the ground level with decent access, and no specific shutdown is required for the work. Contractors are responsible for any required firmware updates after installation and must use Eaton OEM parts for UPS #1 power modules and fans. Government-furnished batteries for UPS #2 are new and compatible. No government forklift will be available.