B1510 NDI HVAC Repair

SOL #: FA480326B0002Solicitation

Overview

Buyer

SHAW AFB, SC, 29152-5125, United States

Place of Performance

Charleston AFB, SC

NAICS

Plumbing (238220)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Refrigeration, Air Conditioning, And Air Circulating Equipment (J041)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Dec 16, 2025
2
Last Updated
Mar 6, 2026
3
Submission Deadline
Apr 15, 2026, 3:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting bids for the B1510 NDI HVAC Repair project at Shaw AFB, SC. This requirement involves the design, demolition, and installation of HVAC equipment for a 4,400-square-foot facility. The project is a 100% Small Business Set-Aside with an estimated magnitude between $250,000 and $500,000. Bids are due April 15, 2026.

Scope of Work

The contractor will provide all labor, materials, and equipment to replace aging HVAC components while integrating with the existing one-year-old chiller. Key tasks include:

  • Design: Development of 35%, 65%, and 95% design submittals and final as-builts.
  • Demolition: Removal of a 40-year-old air handling unit (AHU), hot water coils, a 9-year-old boiler, domestic water heater, and associated ductwork/controls.
  • Installation: Provision of a new 25-ton AHU, new hot water coils, a gas-fired boiler, and a gas-fired domestic water heater.
  • System Upgrades: Installation of an air separator, buffer tank, and new isolation valves; upgrading HVAC controls for connection to the base energy management system.
  • Testing: Performance of a certified test and balance (TAB) upon completion.

Contract & Timeline

  • Contract Type: Construction (Solicitation)
  • Set-Aside: 100% Small Business (NAICS 238220)
  • Period of Performance: Not to exceed 232 calendar days after Notice to Proceed (90-day construction phase).
  • Site Visit (Mandatory): February 3, 2026, at 09:00 AM EST. Access requests are due by January 28, 2026.
  • Questions Due: February 10, 2026, at 2:00 PM EST.
  • Bids Due: April 15, 2026, at 10:00 AM EST.

Evaluation

This is a sealed bid solicitation. A public bid opening is scheduled for April 16, 2026, at 10:00 AM EST at the 20th Contracting Squadron and via Microsoft Teams.

Additional Notes

Bids must be submitted electronically through the Procurement Integrated Enterprise Environment (PIEE). Attendance at the site visit is mandatory for prime contractors competing for the award.

People

Points of Contact

KISHAUNA GOODMANPRIMARY

Files

Files

View
View
View
View
Download

Versions

Version 5
Solicitation
Posted: Mar 6, 2026
View
Version 4
Solicitation
Posted: Jan 23, 2026
View
Version 3Viewing
Solicitation
Posted: Jan 23, 2026
Version 2
Pre-Solicitation
Posted: Dec 16, 2025
View
Version 1
Sources Sought
Posted: Dec 16, 2025
View