B1610 and 2310 Boiler Replacement

SOL #: FA489726Q0008Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA4897 366 CONS PKP
MOUNTAIN HOME AFB, ID, 83648-5296, United States

Place of Performance

Mountain Home AFB, ID

NAICS

Plumbing (238220)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 6, 2026
2
Last Updated
May 7, 2026
3
Submission Deadline
May 6, 2026, 4:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting proposals for the B1610 and 2310 Boiler Replacement project at Mountain Home Air Force Base, ID. This requirement involves the dismantling and installation of new boilers in two buildings. This is a Total Small Business Set-Aside with an estimated value between $25,000 and $100,000. Proposals are due by May 6, 2026, at 10:00 AM MDT.

Scope of Work

Contractors will be responsible for the complete removal and replacement of two existing boilers, one in Building 2310 and one in Building 1610. The scope includes furnishing and installing new Lochinvar KnightXL boilers (or equal) that meet specific salient characteristics, such as a 7" touchscreen, 97% thermal efficiency, and a 10:1 turndown modulating burner. The work involves connecting new boilers to existing electrical, water, and gas lines, installing new appliance regulators, condensate neutralizer kits, BACnet (over IP) cards, and all necessary exhaust/intake ducts, isolation valves, wye strainers, and field flow switches. Minor modifications to existing supply and return lines, insulation of new piping, and boiler start-up by a manufacturer-certified technician are also required. Boilers must be programmed for specific set-points and outdoor reset schedules. The project must be coordinated for late spring, summer, or early fall 2026, with all boilers installed and functioning by October 2, 2026. Service interruptions are strictly prohibited during cold weather months. All work must adhere to Mountain Home AFB Temporary Environmental Controls.

Contract Details

  • Contract Type: Firm Fixed Price.
  • Period of Performance: 190 calendar days from award/notice to proceed.
  • Estimated Value: $25,000 to $100,000.
  • Set-Aside: Total Small Business Set-Aside.
  • NAICS Code: 238220 (Plumbing, Heating, and Air-Conditioning Contractors).
  • Size Standard: $19,000,000.00 Annual Receipts.
  • Place of Performance: Mountain Home AFB, ID.

Submission & Evaluation

  • Proposals Due: May 6, 2026, 10:00 AM MDT.
  • Evaluation Criteria: Proposals will be evaluated based on Price and Technical capabilities/experience. Technical capabilities/experience is an important consideration, and a higher-priced offer may be considered if supported by superior technical capabilities/experience.
  • Offer Validity: Offers must remain valid for at least 60 calendar days.
  • Bonds: Performance and Payment Bonds are required within 10 days of award.
  • Questions: Must be submitted to both the Contracting Officer and Contracting Specialist within three business days from the site visit.

Site Visit & Important Dates

  • Site Visit: April 20, 2026, 10:00 AM MDT.
  • Site Visit RSVP Deadline: April 15, 2026, 12:00 PM MDT. Attendees must submit full names, driver's license numbers, state of issue, company name, and vehicle type to the CONS POCs.
  • Boiler Functioning Deadline: October 2, 2026.

Additional Notes

This opportunity is subject to the Davis-Bacon Act, requiring adherence to prevailing wage rates as outlined in DBA-ID20260020. Contractor personnel must be English proficient, obtain base identification, and provide Operation and Maintenance Manuals for all installed equipment. A pre-construction meeting is mandatory.

People

Points of Contact

Gage BergmanPRIMARY
SrA Deivid BaezSECONDARY

Files

Files

Download
Download
Download
Download
Download

Versions

Version 6
Solicitation
Posted: May 7, 2026
View
Version 5
Solicitation
Posted: May 6, 2026
View
Version 4Viewing
Solicitation
Posted: Apr 27, 2026
Version 3
Solicitation
Posted: Apr 25, 2026
View
Version 2
Solicitation
Posted: Apr 20, 2026
View
Version 1
Solicitation
Posted: Apr 6, 2026
View