B1610 and 2310 Boiler Replacement

SOL #: FA489726Q0008Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA4897 366 CONS PKP
MOUNTAIN HOME AFB, ID, 83648-5296, United States

Place of Performance

Mountain Home AFB, ID

NAICS

Plumbing (238220)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 6, 2026
2
Last Updated
May 7, 2026
3
Submission Deadline
May 13, 2026, 4:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force, 366 CONS PKP, is soliciting proposals for the B1610 and 2310 Boiler Replacement project at Mountain Home Air Force Base, ID. This Total Small Business Set-Aside opportunity involves the dismantling and replacement of two existing boilers. The estimated value for this Firm Fixed-Price contract is $25,000 to $100,000. Proposals are due by May 13, 2026, at 10:00 AM MST.

Scope of Work

The project requires the furnishing and installation of two new Lochinvar KnightXL boilers (Model KBX-1000N-M13 for Bldg. 2310 and KBX-0400N for Bldg. 1610, or equal) with specific salient characteristics (e.g., 7" touchscreen, 97% thermal efficiency, 10:1 turndown). Key requirements include:

  • Connecting new boilers to existing electrical, water, and gas lines.
  • Isolating and removing existing boilers for disposal/recycling.
  • Installing new appliance regulators, condensate neutralizer kits, and BACnet (over IP) cards for the Building Management System.
  • Re-establishing existing Exhaust Combustion System (ECS) capability.
  • Installing exhaust/intake ducts, supply/return isolation valves, tee connections, and wye strainers.
  • Performing minor modifications to existing piping and insulating all new lines.
  • Conducting manufacturer-certified boiler start-up and submitting performance sheets.
  • Installing an outdoor sensor and programming boilers for specific set-points and outdoor reset schedules.
  • Managing debris disposal and maintaining site cleanliness.

Contract & Timeline

  • Contract Type: Firm Fixed Price
  • Set-Aside: Total Small Business Set-Aside (NAICS 238220, Size Standard $19M)
  • Period of Performance: 190 calendar days from award/Notice to Proceed. Boilers must be installed and functioning by October 2, 2026. Work must be coordinated for late spring, summer, or early fall 2026 to avoid cold weather service interruptions.
  • Estimated Value: $25,000 to $100,000
  • Proposal Due: May 13, 2026, 10:00 AM MST (extended by Amendment 3)
  • Site Visit: April 20, 2026, 10:00 AM MDT. Attendees were required to submit information by April 15, 2026.
  • Questions Due: Within three business days from the site visit (April 23, 2026).

Evaluation

Proposals will be evaluated based on Price and Technical capabilities/experience. Technical capabilities will be an important consideration, allowing for a higher-priced offer if supported by superior technical merit. Performance and Payment Bonds are required post-award.

Special Requirements

Contractor personnel must be English proficient, obtain base access, and display identification. Compliance with Mountain Home AFB Temporary Environmental Controls and prevailing wage rates (Davis-Bacon Act) is mandatory. A pre-construction meeting is required, and Operation and Maintenance Manuals for all installed equipment must be provided.

People

Points of Contact

Gage BergmanPRIMARY
SrA Deivid BaezSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 6
Solicitation
Posted: May 7, 2026
View
Version 5Viewing
Solicitation
Posted: May 6, 2026
Version 4
Solicitation
Posted: Apr 27, 2026
View
Version 3
Solicitation
Posted: Apr 25, 2026
View
Version 2
Solicitation
Posted: Apr 20, 2026
View
Version 1
Solicitation
Posted: Apr 6, 2026
View