BAF 78384 PSC & PWI Cage Material Robins AFB

SOL #: FA857126Q3000Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8571 MAINT CONTRACTING AFSC PZIM
ROBINS AFB, GA, 31098-1672, United States

Place of Performance

Warner Robins, GA

NAICS

Other Fabricated Wire Product Manufacturing (332618)

PSC

Hardware (5340)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 19, 2026
2
Last Updated
Mar 5, 2026
3
Submission Deadline
Mar 11, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force, Air Force Sustainment Center PZIMB, Robins AFB, GA, is seeking quotes for Pylon Wing Interface (PWI) and Production Support Center (PSC) Cage Material. This is a Total Small Business Set-Aside combined synopsis/solicitation for the supply and delivery of specific cage systems to Robins AFB, GA. Quotes are due by March 11, 2026, at 7:00 PM EST.

Scope of Work

This opportunity requires the provision of all necessary tools, parts, materials, equipment, and labor for the delivery of:

  • One (1) Production Support Center (PSC) Cage: Dimensions 30'W x 105'L x 20'H, with a top enclosure, panels, one 4' swing door, and one 10' sliding door. It includes sixteen (16) sections of pallet rack (4 levels each), eighteen (18) 8'W x 12'H x 42"D frames with tapered non-jamming slot design, and wire decks (48" deep x 46" wide, two per beam level, 2,500lb capacity each). Key specifications confirmed include 2”x2”x10ga mesh, 10’x10’ door height, required padlock hasp, and doors placed on the 105’ face. The cage is 4-sided.
  • One (1) Pylon Wing Interface (PWI) Cage: Dimensions 25'W x 35'L x 20'H, with a top enclosure, panels, and one 10' sliding door. It includes tapered non-jamming slot design draws and wire decks (48" deep x 46" wide, two per beam level, 2,500lb capacity each). Clarifications indicate that upright beams are already present, and only wire decks are required for this cage. The cage is 4-sided.

Delivery is required within 90 Days After Receipt of Order (ARO), FOB Destination, to Robins AFB, GA. The Government will install the cages. A standard 12-month warranty is required.

Contract Details

  • Contract Type: Firm Fixed-Price (FFP)
  • Set-Aside: 100% Small Business Set-Aside (FAR 19.5)
  • NAICS Code: 332618, Other Fabricated Wire Product Manufacturing, with a size standard of 500 Employees.
  • Period of Performance (Anticipated): March 15, 2026 – March 14, 2027
  • Anticipated Award Date: March 15, 2026
  • Place of Performance: Warner Robins, GA

Submission & Evaluation

This is a combined synopsis/solicitation, and a written solicitation will not be issued. Quotes are being requested.

  • Quote Due Date: March 11, 2026, at 7:00 PM EST.
  • Submission: Email quotes to margaret.gaskill.1@us.af.mil and jeffrey.pruitt@us.af.mil. Facsimile quotes will not be accepted.
  • Required Documents: Company name, address, CAGE Code, Point of Contact (POC), POC email/phone, delivery time frame, capability statement, and a completed FAR 52.212-3, Offeror Representations and Certifications.
  • Evaluation: Award will be made to the responsible offeror whose quote, conforming to the solicitation, is the lowest price. A pre-award survey through DCMA will assess financial capability; offerors must provide a narrative statement and substantiating documentation.
  • Quote Validity: Quotes shall be valid for 30 days after the solicitation response due date.

Key Clarifications & Updates

Recent Q&A documents have provided critical details:

  • PSC Cage: Mesh size confirmed as 2”x2”x10ga, door height 10’x10’, padlock hasp required, wire decking depth 48” (to accommodate 42” deep frames), and beam level capacity 2500 lbs or higher. Both the 4’ swing door and 10’ sliding door will be on the 105’ face. The cage is 4-sided.
  • PWI Cage: Upright beams are already provided; only wire decks are required. The cage is 4-sided.
  • Frame Count: For a non-continuous run of racking with sixteen 8’ wide sections, eighteen frames (uprights) are needed, not seventeen, to accommodate two rows.
  • The solicitation response date has been extended to allow time for Q&A responses.

People

Points of Contact

Margaret GaskillPRIMARY
Lasonia AndersonSECONDARY

Files

Files

Download
Download
Download
Download

Versions

Version 8
Combined Synopsis/Solicitation
Posted: Mar 5, 2026
View
Version 7
Combined Synopsis/Solicitation
Posted: Mar 5, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: Mar 4, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Feb 26, 2026
View
Version 4Viewing
Combined Synopsis/Solicitation
Posted: Feb 26, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Feb 26, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Feb 24, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Feb 19, 2026
View