BEJ Maintenance Compound Roof Replacements
SOL #: W912PM26QA019Solicitation
Overview
Buyer
DEPT OF DEFENSE
Dept Of The Army
W074 ENDIST WILMINGTON
WILMINGTON, NC, 28403-1343, United States
Place of Performance
Moncure, NC
NAICS
Roofing Contractors (238160)
PSC
Construction Of Maintenance Buildings (Y1EB)
Set Aside
Total Small Business Set-Aside (FAR 19.5) (SBA)
Original Source
Timeline
1
Posted
Apr 10, 2026
2
Last Updated
May 19, 2026
3
Submission Deadline
May 12, 2026, 6:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Army Corps of Engineers (USACE), Wilmington District, is soliciting proposals for BEJ Maintenance Compound Roof Replacements at the B. Everett Jordan Dam and Lake facility in Moncure, North Carolina. This opportunity is a Total Small Business Set-Aside for a Firm Fixed-Price contract. Proposals are due by May 12, 2026, at 2:00 PM ET.
Scope of Work
The project involves the removal of existing corrugated metal roofs and installation of new 24-gauge PBR panel roofs. Specifically:
- Compound Building #1: Removal of existing roof and insulation, installation of a filled cavity roof insulation system, and a new 24-gauge PBR panel roof.
- Compound Building #2 (Optional Item 1): Removal of existing roof and installation of a new 24-gauge PBR panel roof (no insulation). The contractor will provide all labor, quality control, supervision, transportation, equipment, fuel, and tools. Work must commence within 10 days of Notice to Proceed (NTP) and be completed within 120 calendar days of NTP.
Contract Details
- Contract Type: Firm Fixed Price
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- NAICS Code: 238160 (Roofing Contractors) with a $19,000,000 size standard.
- Period of Performance: 120 calendar days from the date of the Notice to Proceed.
- Place of Performance: Maintenance Compound, B. Everett Jordan Dam, Moncure, North Carolina.
Submission & Evaluation
- Submission: Both a Price Quote and Technical Proposal must be submitted electronically in Adobe PDF format to benjamin.t.rickman@usace.army.mil and jenifer.m.garland@usace.army.mil. Files must be named using the format:
W912PM26QA019_COMPANY NAME_PRICINGandW912PM26QA019_COMPANY NAME_TECHNICAL. No hard copies will be accepted. - Site Visit: A site visit was held on April 29, 2026, at 10:00 AM ET.
- Questions Due: April 30, 2026, 2:00 PM ET.
- Quotes Due: May 12, 2026, 2:00 PM ET.
- Evaluation: Award will be made to the lowest priced technically acceptable Quote. Technical criteria include SAM registration, a North Carolina General Contractors License (or equivalent), a minimum 5-year workmanship warranty, and a technical proposal demonstrating SOW compliance.
Key Clarifications & Requirements
- Materials: New roofs require 24-gauge PBR panels (Smooth finish, Kynar 500/Signature 300 – Classic Green).
- Safety: Compliance with EM 385-1-1, North Carolina State Building Codes, and all federal/state laws is mandatory.
- Warranty: A minimum 5-year workmanship warranty is required.
- Wage Determination: Bidders must adhere to prevailing wage rates and fringe benefits outlined in General Decision Number NC20260013.
- Asbestos: An asbestos inspection is in progress, and a report will be provided when available.
- Wind Uplift: Design standards are governed by the 2018 North Carolina State Building Code and ASCE 7-16, Exposure Category 'B'.
- Gable Panels: Existing gable panels may be reused if damage-free and field-applied with Kynar Aquatec paint in Classic Green.
- Watertight Installation: Contractor must provide all necessary flashings, closures, and accessories for a watertight installation, including eave closures.