Bid-Build (BB) Install Alternate Connections for Steam and Chilled Water at Lake Nona
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of Veterans Affairs (VA) is seeking bids for a Bid-Build (BB) project to Install Alternate Connections for Steam and Chilled Water at Lake Nona, Orlando, FL. This opportunity is a Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside. The latest amendment and RFI log provide clarifications and extend the proposal submission deadline. Proposals are due February 23, 2026, at 11:00 AM EST.
Scope of Work
This project involves the installation of alternate connections for steam and chilled water systems at the Central Energy Plant (CEP) of the VA Medical Center in Lake Nona, Orlando, FL. The scope includes construction activities related to these utility connections, requiring detailed understanding of existing electrical and mechanical infrastructure.
Key Clarifications & Changes
- Amendment 0003 provides responses to Requests for Information (RFIs) and includes additional requested documents (Attachments 5, 6, 7).
- The proposal submission deadline has been extended to February 23, 2026, at 11:00 AM EST.
- RFI answers clarify several aspects:
- Personnel Qualifications: Superintendent may serve as general SSHO, but specialized operations require a separate Competent Person. QC also requires specific qualifications.
- Site Logistics: Laydown area to be determined at NTP meeting; PIV cards required for all contractors (submit paperwork early); contractor parking specified.
- Technical Requirements: Contractors must verify panel capacity and utilize spare breakers; 14-day notice typically required for utility outages.
- Compliance: All FAR clauses with fill-ins (e.g., 52.204-8, 52.204-24, 52.209-7, 52.212-3) must be completed and returned with Volume 1. Compliance with the Buy American Act is mandatory.
- Project Management: Notice to Proceed (NTP) expected within 14 calendar days of award; bid hold period is 120 days; Procore is an acceptable submittal platform.
- Drawings/Specifications: As-built drawings are available upon request (accuracy not guaranteed); missing Division 23 and Gas Piping specifications will be provided upon request.
Contract & Timeline
- Type: Special Notice (leading to a Bid-Build contract)
- Set-Aside: Service-Disabled Veteran-Owned Small Business (SDVOSB)
- Product Service Code: Y1DZ (Construction Of Other Hospital Buildings)
- Response Due: February 23, 2026, 11:00 AM EST
- Published: February 13, 2026
- Place of Performance: Orlando, FL 32827
Attachments
- Attachment 5 - As-Built Electrical Drawings CEP: Detailed electrical infrastructure for the Central Energy Plant.
- Attachment 6 - Mechanical Drawings CEP: Detailed mechanical systems for the Central Energy Plant.
- Attachment 7 - B.2 Price Cost Schedule: Template for detailed cost breakdown by CSI divisions.