Boiler Blowdown Drainpipe Repair, Corpus Christi

SOL #: 12639526Q0031Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Animal And Plant Health Inspection Service
MRPBS MINNEAPOLIS MN
MINNEAPOLIS, MN, 55401, United States

Place of Performance

Corpus Christi, TX

NAICS

Plumbing (238220)

PSC

Construction Of Miscellaneous Buildings (Y1JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 23, 2026
2
Last Updated
Feb 18, 2026
3
Submission Deadline
Feb 23, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Department of Agriculture (USDA), specifically the Animal and Plant Health Inspection Service (APHIS), is seeking proposals for Boiler Blowdown Drainpipe Repair at the Corpus Christi Classing Office in Corpus Christi, TX. This Total Small Business Set-Aside opportunity aims to repair and potentially replace a failed drainpipe to restore safe, code-compliant drainage. The estimated magnitude of the project is between $25,000 and $100,000.

Scope of Work

The contractor will provide all labor, materials, equipment, and supervision for the repair and replacement of a boiler blowdown drainpipe located beneath the concrete floor of the mechanical room. Key tasks include:

  • Pre-Work: Site visit, scheduling, utility identification, and safety measures.
  • Demolition & Access: Saw-cutting and removal of concrete, excavation to access the pipe, and protection of adjacent equipment.
  • Drainpipe Removal: Removal and disposal of the existing pipe.
  • Installation: Installation of a new, high-temperature-suitable drainpipe with proper slope, alignment, and secure connections, including fittings, supports, and potential thermal protection.
  • Testing: Performing leak and functional flow testing of the new line.
  • Concrete Restoration: Backfilling, compacting, installing vapor barrier (if applicable), pouring, and finishing new concrete to match existing conditions.
  • Cleanup: Removal of debris and restoration of the mechanical room to a clean, operational state. The primary intention is repair; full replacement would be a negotiated modification if necessary.

Contract Details

  • Contract Type: Combined Synopsis/Solicitation (Request for Quotations - RFQ)
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Estimated Value: $25,000 - $100,000
  • Period of Performance: Work must commence within five calendar days after Notice to Proceed and be completed within 120 days.
  • Place of Performance: USDA Corpus Christi Classing Office, Corpus Christi, TX.
  • Key Requirements: Compliance with OSHA standards, USDA facility access protocols, use of qualified personnel, and adherence to Federal Construction Wage Rates for Nueces County, TX. A payment bond will be required within 10 days of award.

Submission & Evaluation

  • Quote Submission Deadline: February 23, 2026, at 12 p.m. CT.
  • Submission Method: Email quotes to james.g.roloff@usda.gov.
  • Quote Package: Must include the RFQ page, a demonstration of relevant experience, and past performance information.
  • Evaluation: Award will be made on a Lowest Price, Technically Acceptable (LPTA) basis. Evaluation factors include Price (with realism assessment), Technical Capability (relevant HVAC experience), and Past Performance.
  • Questions Deadline: February 16, 2026, at 12 p.m. CT, submitted to james.g.roloff@usda.gov.

Clarifications & Notes

An amendment (0001) incorporated a revised Statement of Work. Recent clarifications indicate that one superintendent can fulfill supervision, safety, and QAQC roles (if not a working superintendent), and contract-specific QA/QC and Safety Plans are not required with the initial quote. A video recording of the line scope is available on SAM.gov, and bidders may need to run their own camera for full assessment. The existing cast-iron floor drain only needs replacement if damaged and unusable. A site visit was held on February 9, 2026.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download

Versions

Version 6
Combined Synopsis/Solicitation
Posted: Feb 18, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Feb 17, 2026
View
Version 4Viewing
Combined Synopsis/Solicitation
Posted: Feb 13, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Feb 12, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Jan 28, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Jan 23, 2026
View